2010
DOI: 10.3763/aedm.2010.idds1
|View full text |Cite
|
Sign up to set email alerts
|

Challenges for Integrated Design and Delivery Solutions

Abstract: /npsi/ctrl?lang=en http://nparc.cisti-icist.nrc-cnrc.gc.ca/npsi/ctrl?lang=fr Access and use of this website and the material on it are subject to the Terms and Conditions set forth at http://nparc.cisti-icist.nrc-cnrc.gc.ca/npsi/jsp/nparc_cp.jsp?lang=en NRC Publications Archive Archives des publications du CNRCThis publication could be one of several versions: author's original, accepted manuscript or the publisher's version. / La version de cette publication peut être l'une des suivantes : la version prépubli… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
68
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 77 publications
(70 citation statements)
references
References 5 publications
2
68
0
Order By: Relevance
“…This suggests that the construction professionals have yet to align with this perception. The collaborative process was found to have a statistically significant effect on BIM adoption, which was in line with previous research (Jayasena and Weddikkara, 2013;Arayici et al, 2011;Arayici, Egbu and Coates, 2012;Yeomans, Bouchlaghem and El-Hamalawi, 2006;Owen et al, 2010). However, business process re-engineering and computer integrated construction both had a statistically significant effect on collaborative processes.…”
Section: Figure 2 Structural Modelsupporting
confidence: 81%
See 1 more Smart Citation
“…This suggests that the construction professionals have yet to align with this perception. The collaborative process was found to have a statistically significant effect on BIM adoption, which was in line with previous research (Jayasena and Weddikkara, 2013;Arayici et al, 2011;Arayici, Egbu and Coates, 2012;Yeomans, Bouchlaghem and El-Hamalawi, 2006;Owen et al, 2010). However, business process re-engineering and computer integrated construction both had a statistically significant effect on collaborative processes.…”
Section: Figure 2 Structural Modelsupporting
confidence: 81%
“…The apprehension of distrust and litigation processes often leads to ineffective collaboration. The noncollaborative nature of the construction industry is fuelled by the rampant silo working mode, where all intelligent coordination and agility advantages gained in a collaborative environment are corrupted or lost (Owen et al, 2010;Jayasena and Weddikkara, 2013;Enegbuma et al, 2014). Thus, collaborative processes serve to mediate between business process re-engineering and computer integrated construction to improve BIM adoption.…”
Section: Collaborative Processesmentioning
confidence: 99%
“…Together with IT helps in the design process and project planning, since it can be extended to materials and builders suppliers. Further, assists manufacture and installation, improving the quality and performance of entire project itself [16]. Some examples below will support these facts.…”
Section: Innovation In Spatial Flexibilitymentioning
confidence: 73%
“…The apprehension of distrust and litigation processes often leads to ineffective collaboration [26]. The non collaborative nature of the construction industry is fuelled by the rampant silo working mode, where all intelligent, coordination and agility advantages gained in a collaborative environment are corrupted or lost [48] [26]. Procurement systems in various industries often contribute to inadequate collaboration.…”
Section: Bim Perception and Collaborative Processesmentioning
confidence: 99%