Component-level construction schedule optimization for hybrid concrete structures

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 15 publications
(10 citation statements)
references
References 27 publications
0
10
0
Order By: Relevance
“…Figure 10 demonstrates that in the event that the delivery of the prefabricated components required in activity 9 is delayed by 2 days, the maximum completion time of the project is delayed by 24 days. Activities 10,11,12,13,20,21,22,23, and 24 all delayed the start time compared with the schedule in Figure 8. Especially for activity 20, even if all its predecessors have been executed on the 13th day, due to the constraints of renewable resources, activity 20 has to wait until the 16th day to start work.…”
Section: Simulation Resultsmentioning
confidence: 94%
See 1 more Smart Citation
“…Figure 10 demonstrates that in the event that the delivery of the prefabricated components required in activity 9 is delayed by 2 days, the maximum completion time of the project is delayed by 24 days. Activities 10,11,12,13,20,21,22,23, and 24 all delayed the start time compared with the schedule in Figure 8. Especially for activity 20, even if all its predecessors have been executed on the 13th day, due to the constraints of renewable resources, activity 20 has to wait until the 16th day to start work.…”
Section: Simulation Resultsmentioning
confidence: 94%
“…Accordingly, it is difficult to directly apply the traditional scheduling method to the scheduling research of prefabricated buildings [18]. Some studies have tried to develop an effective assembly-type construction project scheduling method, including mathematical modeling optimization and simulation modeling [19][20][21][22]. However, these previous studies show that the traditional project scheduling technology often ignores the impact of untimely component supply on site construction, or model optimization is usually carried out on the premise of timely and quantitative supply of components.…”
Section: Introductionmentioning
confidence: 99%
“…Optimization algorithms determine the best solution by building a numerical model and solving heuristic algorithms, which are often used for scheduling and cost analysis. Heuristic algorithms currently used in SROSC include genetic algorithms (Dan et al 2021;Hyun et al 2021), particle swarm optimization (Liu et al 2019a), algorithm solvers (Ma et al 2018), and novel algorithms developed by researchers (Ma et al 2021;Rausch et al 2021). Topic 3: Optimization-Based Information Technologies.…”
Section: Topic Analysismentioning
confidence: 99%
“…2. When the old individual is eliminated, a new individual is produced by it through non-uniform mutation (Chauhan et al, 2021;Ma, 2021). This method has a strong capability of global search in the early stage, and changes to local fine search in the later stage.…”
Section: Genetic Algorithm Based On Telomere Operatormentioning
confidence: 99%