Construction of testing facilities and verifying tests of a 22.9 kV/630 A class superconducting fault current limiter

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2011
2011
2014
2014

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…And, if fault current flows, superconducting element is quenched, within 1/4 cycle fault current is limited. It minimizes the influence to the external equipment in electric power system and minimizes the damage, as well as after completing the fault current limitation role, within 0.5 sec it is reversed to superconducting status [3][4][5][6][7].…”
Section: 서 론mentioning
confidence: 99%
“…And, if fault current flows, superconducting element is quenched, within 1/4 cycle fault current is limited. It minimizes the influence to the external equipment in electric power system and minimizes the damage, as well as after completing the fault current limitation role, within 0.5 sec it is reversed to superconducting status [3][4][5][6][7].…”
Section: 서 론mentioning
confidence: 99%
“…Recently, the fault current of the 345kV power systems, which play the central role in South Korea, also exceeded the breaking capacity of circuit breakers [2][3][4][5][6][7][8]. They were replaced with higher-grade breakers as with the 154kV systems, but because they cannot endure the fault current either, the bus separation system has been adopted [4][5][6][7][8]. The bus separation system, however, decreases the coherence between systems when operated for a long time.…”
Section: Introductionmentioning
confidence: 99%
“…The bus separation system, however, decreases the coherence between systems when operated for a long time. This damages stability and destroys the active and reactive power transmission flexibility, which leads to low supply reliability [5][6][7][8]. In addition, many methods for reducing the fault current have been presented, such as replacement of circuit breakers and installation of serial reactors and high-impedance transformers.…”
Section: Introductionmentioning
confidence: 99%