2020
DOI: 10.2478/jeppm-2020-0008
|View full text |Cite
|
Sign up to set email alerts
|

Continuous Improvements at Operator Level

Abstract: Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper presents a case study from the offshore renewable industry, closely related to construction. The paper aims to develop and evaluate a conceptual model combining takt planning and the Deming cycle within the offshore wind construction environment. The conceptual model has through interactions with construction experts been modified fo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…Later, the lean construction tool Location-Based Scheduling (LBS) emerged (Kenley and Seppänen 2010) and proved its ability to compress construction schedules (Evinger et al 2013;Lerche et al 2019a;Lerche et al 2019b;Seppänen et al 2014). Takt Time Planning (TTP), which is similar to LBS (Seppänen 2014), has also shown its ability to compress schedules (Heinonen and Seppänen 2016;Lerche et al 2020b). Only a few research have, though, investigated how DW can be increased.…”
Section: Background: Labour Efficiency and Lean In Constructionmentioning
confidence: 99%
“…Later, the lean construction tool Location-Based Scheduling (LBS) emerged (Kenley and Seppänen 2010) and proved its ability to compress construction schedules (Evinger et al 2013;Lerche et al 2019a;Lerche et al 2019b;Seppänen et al 2014). Takt Time Planning (TTP), which is similar to LBS (Seppänen 2014), has also shown its ability to compress schedules (Heinonen and Seppänen 2016;Lerche et al 2020b). Only a few research have, though, investigated how DW can be increased.…”
Section: Background: Labour Efficiency and Lean In Constructionmentioning
confidence: 99%