2004
DOI: 10.1002/ecjc.20107
|View full text |Cite
|
Sign up to set email alerts
|

Crew roster scheduling by the extended cooperative genetic algorithm

Abstract: SUMMARYA hybrid scheme that combines an annealing method and an extended cooperative genetic algorithm (cGA) obtained by treating the problem of scheduling a flight crew roster as a multiobjective problem is proposed. The setting of the problem of scheduling of an airplane operating crew roster and the construction of the solution method for multiobjective optimization are discussed and the efficacy of the scheme proposed is verified.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 7 publications
0
0
0
Order By: Relevance