All Days 1998
DOI: 10.2118/50677-ms
|View full text |Cite
|
Sign up to set email alerts
|

Cuttings Flow Meters Monitor Hole Cleaning in Extended Reach Wells

Abstract: fax 01-972-952-9435. AbstractThis paper presents an innovative solution to monitor hole cleaning in Extended Reach Wells. It was successfully used while developing marginal oil and gas reserves offshore TIERRA DEL FUEGO (ARGENTINA) by TOTAL AUSTRAL operator and partners DEMINEX and PAN AMERICAN ENERGY.Keeping the hole clean in Extended Reach Wells is a key issue as cuttings accumulation will result in increased torque, pressure losses and will create a high risk of getting a stuck pipe.Cuttings Flow Meters (CF… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2000
2000
2023
2023

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 21 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…A specific tool measuring returned cuttings quantity has been developed originally for an exploration drilling campaign in Argentina ten years ago 17 . The instrument is collecting in a tray the cuttings at the outlet of the shale shaker.…”
Section: Cuttings Flow Metermentioning
confidence: 99%
“…A specific tool measuring returned cuttings quantity has been developed originally for an exploration drilling campaign in Argentina ten years ago 17 . The instrument is collecting in a tray the cuttings at the outlet of the shale shaker.…”
Section: Cuttings Flow Metermentioning
confidence: 99%
“…Problems of criteria to evaluate HCE were the same with foams and conventional fluids. Therefore, a simple experimental set-up, based on the Cutting Flow Meter (CFM) principle [5], was designed to study the carrying capacity of any kind of fluids. In order to simulate the drilled solids, glass balls with different diameters were used (Figure 1).…”
Section: Experimental Studymentioning
confidence: 99%
“…Total Austral has conducted an ERD program in the past years, resulting in high performances in term of drilled length [5]. CFM data available have been used to evaluate the interest of the dimensionless numbers on the rig site.…”
Section: On-sitevalidation Of the Conceptmentioning
confidence: 99%
“…[4][5][6]. Additionally, cuttings can be removed effectively and efficiently in extended-reach wells by pumping fluid at a high flow rate [7]. The effect of this methodology is apparent in short-reach wells.…”
Section: Introductionmentioning
confidence: 99%