2002
DOI: 10.1080/00207540210137648
|View full text |Cite
|
Sign up to set email alerts
|

Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0
1

Year Published

2006
2006
2018
2018

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 17 publications
(8 citation statements)
references
References 17 publications
0
7
0
1
Order By: Relevance
“…As a matter of fact, manufacturing organisations need new approaches to control their manufacturing activities in such a dynamic and competitive environment. As a result in the late 20th century, flexible production systems emerged in order to manufacture medium-sized products (Veeravalli et al, 2002;Wang and Deng, 1999;Jerald et al, 2006).…”
Section: Introductionmentioning
confidence: 99%
“…As a matter of fact, manufacturing organisations need new approaches to control their manufacturing activities in such a dynamic and competitive environment. As a result in the late 20th century, flexible production systems emerged in order to manufacture medium-sized products (Veeravalli et al, 2002;Wang and Deng, 1999;Jerald et al, 2006).…”
Section: Introductionmentioning
confidence: 99%
“…Esnek üretim sistemleri, 20. Yüzyılın sonlarına doğru rekabet edebilirliği oldukça yüksek bir üretim stratejisi olarak ortaya çıkmış ve geleneksel üretim sistemlerine göre orta çeşitlilik ve büyüklükteki ürünlerin üretilebileceği en uygun yol olarak kendini göstermiştir [1][2][3]. Esnek üretim sistemlerinde üretilen ürünleri, müşteriye rekabetçi piyasa koşulları altında zamanında teslim etmek çok önemlidir.…”
Section: Introductionunclassified
“…Scheduling and dispatching AGVs in manufacturing systems has been the subject of significant research since the mid-1990s, with various heuristic dispatching rules developed for single-load AGVS (e.g., Hoff and Sarker 1998, Seifert et al 1998, Jeong and Randhawa 2001, Yamashita 2001, Veeravalli et al 2002, Abdelmaguid et al 2004, de Koster et al 2004. When a workstation sends a pick-up request to the control system and several AGVs are idle, a workstation-initiated rule is applied to select an AGV.…”
Section: Introductionmentioning
confidence: 99%