1995
DOI: 10.1063/1.48074
|View full text |Cite
|
Sign up to set email alerts
|

Design, construction, and wire calibration of PAR BPM striplines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The rms orbit error was corrected from 2 mm to about 0.5 mm using the singular value decomposition (SVD) technique. The booster has now been ramped to 7 GeV. In the SR all 360 rf BPM stations are installed and almost all are responding to beam.…”
Section: A Beam Projile Monitormentioning
confidence: 99%
See 1 more Smart Citation
“…The rms orbit error was corrected from 2 mm to about 0.5 mm using the singular value decomposition (SVD) technique. The booster has now been ramped to 7 GeV. In the SR all 360 rf BPM stations are installed and almost all are responding to beam.…”
Section: A Beam Projile Monitormentioning
confidence: 99%
“…When completed in 1996, the APS will be a synchrotron radiation user facility with one of the worlds brightest x-ray sources in the 10-keV to 100-keV regime [I]. Its 200-MeV electron linac, 450-MeV positron linac, positron accumulator ring (PAR), 7-GeV injector synchrotron (IS), 7-GeV storage ring (SR), and undulator test line provide the opportunity for development and demonstration of key particle beam characterization techniques over a wide range of parameter space. A description of the overall status with an emphasis on the diagnostic systems or techniques is provided.…”
Section: Introductionmentioning
confidence: 99%