Design iteration in construction projects – Review and directions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
21
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 27 publications
(21 citation statements)
references
References 15 publications
0
21
0
Order By: Relevance
“…The use of alternative methods or new methods, especially the use of equipment with simple technology or appropriate use, with small-scale capacity in concrete casting work in simple areas and islands that are very suitable and very helpful, this is related to using simple equipment, appropriate technology, small scale, can move fast, low investment costs, use local parts and can be made and managed by local people who use simple tools will be more effective and efficient (Mujumdar & Maheswari, 2018). For the work of small-scale projects in remote areas and small islands, the use of equipment should be adjusted to the needs, if using large-scale equipment is very inefficient, because the cost of mobilization will be high and the productivity of the tool is too large, thus the project will suffer losses.…”
Section: Introductionmentioning
confidence: 99%
“…The use of alternative methods or new methods, especially the use of equipment with simple technology or appropriate use, with small-scale capacity in concrete casting work in simple areas and islands that are very suitable and very helpful, this is related to using simple equipment, appropriate technology, small scale, can move fast, low investment costs, use local parts and can be made and managed by local people who use simple tools will be more effective and efficient (Mujumdar & Maheswari, 2018). For the work of small-scale projects in remote areas and small islands, the use of equipment should be adjusted to the needs, if using large-scale equipment is very inefficient, because the cost of mobilization will be high and the productivity of the tool is too large, thus the project will suffer losses.…”
Section: Introductionmentioning
confidence: 99%
“…It is therefore not surprising that evidence exist that suggest that the design and construction failures originate from this ill-structured design process. It is therefore important that adequate effort must be taken to ensure a robust design strategy is in place from the onset and that all relevant stakeholders buy in the strategy [3]. One strategy implemented to reduce project delivery time is to reduce the design delivery time through the parallelism of sequential activities and it is not surprising therefore that many researchers have explored this aspect [4][5][6][7][8][9].…”
Section: Introductionmentioning
confidence: 99%
“…The design phase of any construction project is cyclic, repetitive, and evolutionary, involving designers from various design groups such as architectural, structural, mechanical, electrical, plumbing, and others (Mujumdar & Maheswari, 2018). The design process usually includes the following activities: product conception and feasibility analysis; product definition (preliminary design solution); interface coordination; detailing (final solution and constructive detailing) (Cambiaghi & Amá, 2006).…”
Section: The Design Phase Of Construction Projectsmentioning
confidence: 99%
“…The design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase (Mujumdar & Maheswari, 2018). The effective workflow in the design phase can be defined as the information flow between the correct people at the correct times (Al Hattab & Hamzeh, 2015).…”
Section: The Design Phase Of Construction Projectsmentioning