Proceedings of the Proceedings of the 1st International Conference on Engineering, Science, and Commerce, ICESC 2019, 18-19 Oct 2019
DOI: 10.4108/eai.18-10-2019.2289944
|View full text |Cite
|
Sign up to set email alerts
|

Development of The Use of Reclaimed Asphalt Pavement and Plastic Waste in Hot Mix Asphalt for Road Maintenance

Abstract: The technology of asphalt pavement recycling in road maintenance works has developed quite rapidly. Meanwhile, the use of plastic in hot asphalt mixtures has also developed. For this reason, the mix of RAP with LDPE plastics was carried out. The study was designed using a factorial experiment with a Completely Randomized Design (CRD) consisting of two factors and three levels. The first factor is the concentration of plastic levels of 3 levels, namely: a1 = 10%; a2 = 15% and a3 = 25%. The second factor (B) is … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
0
0
Order By: Relevance
“…Adding percentages of 10, 15, and 20% LDPE plastic was examined in preparing recycled asphalt pavement (RAP) with a treatment of 0, 2, and 4% new asphalt. The results showed a significant increase in stability despite the increase in cavity properties of the modified samples [13].…”
Section: Introductionmentioning
confidence: 92%
“…Adding percentages of 10, 15, and 20% LDPE plastic was examined in preparing recycled asphalt pavement (RAP) with a treatment of 0, 2, and 4% new asphalt. The results showed a significant increase in stability despite the increase in cavity properties of the modified samples [13].…”
Section: Introductionmentioning
confidence: 92%