2017
DOI: 10.1007/s12205-017-1950-6
|View full text |Cite
|
Sign up to set email alerts
|

Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 23 publications
(3 citation statements)
references
References 30 publications
0
3
0
Order By: Relevance
“…Mechanism of Seepage Analysis. Formula (2) [4,9] is the governing equation of three-dimensional transient flow in anisotropic porous media. It is also the constitutive model used in this paper.…”
Section: Numerical Simulationmentioning
confidence: 99%
See 1 more Smart Citation
“…Mechanism of Seepage Analysis. Formula (2) [4,9] is the governing equation of three-dimensional transient flow in anisotropic porous media. It is also the constitutive model used in this paper.…”
Section: Numerical Simulationmentioning
confidence: 99%
“…The construction of excavation pits below the groundwater table needs to lower the water table below the excavation face, so the dewatering scheme is vital. Effective dewatering measures are aimed at preventing uplift and fail of the base, avoiding quicksand and piping, and improving the stability and keeping the excavation face dry [4]. However, the dewatering work will lead to ground settlement inevitably.…”
Section: Introductionmentioning
confidence: 99%
“…Structure. Because of the thixotropic nature and flow deformation of soft soil, the stability of the supporting structure and the surrounding buildings must be ensured during excavation and deformation must be controlled within a reasonable range [19,20]. e construction of the supporting structure is layered, and the structure was constructed during the excavation of the foundation pit.…”
Section: Design Of the Supportingmentioning
confidence: 99%