25th Annual Conference of the International Group for Lean Construction 2017
DOI: 10.24928/2017/0341
|View full text |Cite
|
Sign up to set email alerts
|

Discrete Costing Versus Collaborative Costing.

Abstract: The UK construction industry has witnessed a recent shift towards integrated and collaborative approaches. Such collaborative efforts include the use of integrated systems like BIM, lean and innovative procurement options which are now reshaping project delivery systems. However, in the UK, most efforts have focused primarily on the conventional project management system, which is coherent and contract-based and has brought the separation in the processes of costing/design and production. In fact, cost and des… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
2
2
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(10 citation statements)
references
References 3 publications
0
10
0
Order By: Relevance
“…Moreover, the study further explored the "conceptualization of design processes" which describes TVD as a lean design management method. Namadi et al (2017) described, based on the identified findings in the literature, five TVD characteristics: Instead of designing and then converging later for group reviews and decisions, the concept emphasize on working together to define the issues, produce decisions then design to those decisions.…”
Section: Target Value Designmentioning
confidence: 99%
See 3 more Smart Citations
“…Moreover, the study further explored the "conceptualization of design processes" which describes TVD as a lean design management method. Namadi et al (2017) described, based on the identified findings in the literature, five TVD characteristics: Instead of designing and then converging later for group reviews and decisions, the concept emphasize on working together to define the issues, produce decisions then design to those decisions.…”
Section: Target Value Designmentioning
confidence: 99%
“…In order to determine the TVD maturity and to answer the RQ, a scorecard has been developed based on identified TVD characteristics in cited and well-known articles investigating TVD (Ballard 2008;Pennanen and Ballard 2008;Ballard and Morris 2010;Lee et al 2012;Zimina et al 2012;Denerolle 2013;Namadi et al 2017). A TVD 'characteristic' is an element or an activity which has been identified in the literature to be a part of the TVD process.…”
Section: Determination Of Tvd Maturitymentioning
confidence: 99%
See 2 more Smart Citations
“…This is very much an isolated task driven solely by the cost manager on the project with little regard to collaborative costing by all project participants. The practice of neglecting collaborative approach to costing has arguably been the major cause of cost overruns experienced on construction projects (Namadi, Pasquire and Manu 2017).…”
Section: Introductionmentioning
confidence: 99%