2009
DOI: 10.1007/978-3-642-05465-5_18
|View full text |Cite
|
Sign up to set email alerts
|

Disruption Management in Passenger Railway Transportation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
64
0
1

Year Published

2010
2010
2023
2023

Publication Types

Select...
4
3
3

Relationship

3
7

Authors

Journals

citations
Cited by 113 publications
(69 citation statements)
references
References 28 publications
0
64
0
1
Order By: Relevance
“…Traditionally, the focus of action in such cases is to re-plan in order to restore the transport system according to the original plan and, e.g., get the stranded travelers to their destinations [6]. See [7] for an overview of the existing literature and discussions on this topic. In general, real-time data can improve the re-planning decisions through enabling the planners to base their decisions on more data and/or more accurate data.…”
Section: Operationsmentioning
confidence: 99%
“…Traditionally, the focus of action in such cases is to re-plan in order to restore the transport system according to the original plan and, e.g., get the stranded travelers to their destinations [6]. See [7] for an overview of the existing literature and discussions on this topic. In general, real-time data can improve the re-planning decisions through enabling the planners to base their decisions on more data and/or more accurate data.…”
Section: Operationsmentioning
confidence: 99%
“…This, as well as the limited time available to calculate a solution, adds to the complexity of the problem. Jespersen-Groth et al (2009) describe the general disruption management process of passenger railway transportation companies in Europe. The three main subproblems of the disruption process (timetable adjustment, rolling stock rescheduling and crew rescheduling) are discussed in detail.…”
Section: Introductionmentioning
confidence: 99%
“…Due to the intensity of train traffic (short follow-on times) but also because train crew are not linked to fixed routes, train traffic and crew deployment are relatively susceptible to disruptions (Jespersen-Groth et al [2]). In the event of major disruptions (intersections or track sections becoming blocked), the result can be that during the execution dozens or even more than one hundred work lines for train crew members have to be revised.…”
Section: Management Of the Train Servicementioning
confidence: 99%