Evaluation of Key Factors of Logistics Risks for Overseas EPC Projects

Abstract: Correctly identifying and evaluating the logistics risks of EPC (engineering procurement construction) projects is conducive to strengthening the risk prevention and control of engineering projects. An evaluation index system for the logistics risk factors of overseas EPC projects was established, and the entropy-DEA (Data Envelopment Analysis) method used to evaluate and sort risk decision-making unit (DMU) with risk likelihood and risk consequences as decision variables. The risk reduction ratio and improvem… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 34 publications
0
3
0
Order By: Relevance
“…• Engineering & construction projects located in remote areas, transportation difficulties for large equipment, on-site transportation conditions, loading, and warehousing operations bring great difficulties to EPC logistics operations (He & Han, 2022).…”
Section: Cost Structure Of Epcmentioning
confidence: 99%
“…• Engineering & construction projects located in remote areas, transportation difficulties for large equipment, on-site transportation conditions, loading, and warehousing operations bring great difficulties to EPC logistics operations (He & Han, 2022).…”
Section: Cost Structure Of Epcmentioning
confidence: 99%
“…Figure 4 identifies the logistics risks for overseas EPC projects. Apart from the above, there are also additional risk factors affected by natural factors (He and Han 2022) or geographical conditions such as thunderstorms, earthquakes, and tsunamis, especially for areas vulnerable to such risks. The social risks can hardly be identified in the early stage since it involves public tolerance of the projects.…”
Section: Project Logistics Riskmentioning
confidence: 99%
“…They identified 25 possible risks in the procurement process through case studies, literature analysis, and expert interviews, and used Integrated Interpretative Structural Modelling (ISM) and Cross-Impact Matrix Multiplication Applied to Classification (MICMAC) to identify the risks in the procurement process. Jingshi He et al conducted a detailed analysis of the risks in the transportation of material procurement in international projects based on the characteristics of international projects and used the entropy-DEA (Data Envelopment Analysis) method to analyze the risks in each logistics [11]. Patricia Galloway presents the risks that EPC projects may encounter contractually in today's fast-changing society, including pricing issues in turnkey contracts, prudential requirements, and risks to ensure sustainability [12].…”
Section: Risk Classificationmentioning
confidence: 99%