2013
DOI: 10.1016/j.eswa.2013.01.049
|View full text |Cite
|
Sign up to set email alerts
|

Evolutionary optimization of model specification searches between project management knowledge and construction engineering performance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 30 publications
0
3
0
Order By: Relevance
“…Although numerous studies [14][15][16]19,20,30] demonstrated that an efficient, effective, and fair dispute resolution process is essential for PPP project success, this study focuses on identifying potential handling methods by associating project information with dispute resolutions. The proposed association mining technique can provide project stakeholders with the information needed to implement proactive measures during project preparation.…”
Section: Introductionmentioning
confidence: 99%
“…Although numerous studies [14][15][16]19,20,30] demonstrated that an efficient, effective, and fair dispute resolution process is essential for PPP project success, this study focuses on identifying potential handling methods by associating project information with dispute resolutions. The proposed association mining technique can provide project stakeholders with the information needed to implement proactive measures during project preparation.…”
Section: Introductionmentioning
confidence: 99%
“…It is not only affected by internal such as quality, cost, schedule, security and other aspects, but also by external influences such as social, economic, legal, natural and other environmental factors [1]. Project management performance evaluation is a very important and necessary link, enabling enterprises to perform all aspects of schedule control, budget adjustments, and other cost assessment correctly and improve the effectiveness and efficiency planned future projects assessment [2]. BP neural network with its parallel distributed processing, self-organizing, adaptive, unique self-learning excellent performance and fault tolerance, can better handle project management performance evaluation of multiple factors, uncertainty, complex nonlinear mapping problems [3].…”
Section: Introductionmentioning
confidence: 99%
“…International joint ventures are mostly project-specific in nature (Kim et al 2009, Hung et al 2002, Chou and Yang 2013. The Bahrain FORMULA-1 Circuit is considered as one of the best international racing car track in terms of technical aspects and architectural quality (an aerial shot in Fig.…”
Section: Introductionmentioning
confidence: 99%