2022
DOI: 10.21744/irjeis.v8n6.2209
|View full text |Cite
|
Sign up to set email alerts
|

Factors caused for delays and alternatives in the Denpasar living world mall building project

Abstract: Every construction project is always faced with the possibility of problems in the project. In reality, the implementation of construction projects always experiences obstacles that result in delays in the completion of work, so that the completion time of the work is not in accordance with the work plan that has been set. Delays that occur will cause losses for related parties, especially owners and contractors, because they are generally accompanied by conflicts, demands for time and costs, and deviations in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…24/PRT/M/2008 and Regulation of the Directors of PT Kereta Api Indonesia (Persero) Number PER.U/KL.104/V/I/KA-2020. However, the researcher found several shortcomings of the guidelines, that is the lack of guidelines regarding the inspection and maintenance of work package items that need to be maintained and looked after in station buildings Kovacevic et al, 2016;Santiana et al, 2022;Farrington-Darby et al, 2005). So the researcher carried out expert validation once more on the guidelines that had been refined by technically using 5 experts to validate, and if less than 3 experts disagreed regarding the guidelines, it will be reviewed based on the experts' input.…”
Section: Maintenance and Care Guidelines Based On Maintenance And Car...mentioning
confidence: 99%
“…24/PRT/M/2008 and Regulation of the Directors of PT Kereta Api Indonesia (Persero) Number PER.U/KL.104/V/I/KA-2020. However, the researcher found several shortcomings of the guidelines, that is the lack of guidelines regarding the inspection and maintenance of work package items that need to be maintained and looked after in station buildings Kovacevic et al, 2016;Santiana et al, 2022;Farrington-Darby et al, 2005). So the researcher carried out expert validation once more on the guidelines that had been refined by technically using 5 experts to validate, and if less than 3 experts disagreed regarding the guidelines, it will be reviewed based on the experts' input.…”
Section: Maintenance and Care Guidelines Based On Maintenance And Car...mentioning
confidence: 99%
“…Data analysis method. The results and discussion were obtained in the form of material management risk factors which have a dominant influence on cost and time performance in multi-storey building projects, then discussions were carried out (Akintoye & MacLeod, 1997;Öztaş & Ökmen, 2005;Santiana et al, 2022). Decisions are taken from the results and discussion, and then validation of the findings is carried out by compiling literature.…”
Section: Research Stagesmentioning
confidence: 99%
“…The effectiveness of the development of a risk prevention plan for workers of washers and lubricators is given by identifying the risks to which workers are exposed and ensuring that working conditions are adequate, which is necessary for the performance of the rights of workers and their protection. Currently, the washers and lubricators do not have the requirements that the Ministry of Labor requires of both public and private companies, hence the proposal of this research is to create a plan for workers since it will be possible to integrate the preventive activities of the company to its general management system and establishes its own occupational risk prevention policy (Farr, 1975;Sutapa et al, 2022;Santiana et al, 2022).…”
Section: Introductionmentioning
confidence: 99%