Provided the results of a research conducted to investigate the relationships between the empirical vibration attenuation equation of Peak Particle Velocity (PPV) and the Scaled Charge (SC) through testing the blasting-induced vibrations on the spot of Wanshishan tunnel based on 96 vibration recordings. It is found that the maximum charge amount per delay in Wanshishan tunnel excavating is determined by the buildings on the surface and the constructed tunnel nearby. Considering that the repeated blast loading in tunnel blasting caused accumulative effects of damage on buildings, comfortable threshold damage limits of PPV to maintain buildings safety was given. Dynamic Stress Ratio (DSR) was adopted to study the stability of constructed tunnel on the action of blasting induced vibrations. The method to determine specific maximum charge amount per delay in Wanshishan tunnel excavation was given. It is proved that the findings in this study are very effective to control the negative effects of blasting-induced vibrations on buildings on the surface and constructed tunnel nearby.