2014
DOI: 10.1016/j.proenv.2014.11.037
|View full text |Cite
|
Sign up to set email alerts
|

From BIM to Geo-analysis: View Coverage and Shadow Analysis by BIM/GIS Integration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
56
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 65 publications
(57 citation statements)
references
References 8 publications
1
56
0
Order By: Relevance
“…It is important to note that some information cannot be extracted or calculated from BIM and instead must be manually entered. For example, when an element (e.g., scaffolding) does not exist in the building model or a needed quantity cannot be calculated based the component properties [12]. Here, the BIM visualization capability is exploited to generate reports and alerts graphically; this drastically reduces the amount of time needed to generate bills of quantities and yields a 3D visualization of the material status instantaneously by comparing the incoming quantity versus the planned quantity without necessitating statistical reports [7].…”
Section: Introductionmentioning
confidence: 99%
“…It is important to note that some information cannot be extracted or calculated from BIM and instead must be manually entered. For example, when an element (e.g., scaffolding) does not exist in the building model or a needed quantity cannot be calculated based the component properties [12]. Here, the BIM visualization capability is exploited to generate reports and alerts graphically; this drastically reduces the amount of time needed to generate bills of quantities and yields a 3D visualization of the material status instantaneously by comparing the incoming quantity versus the planned quantity without necessitating statistical reports [7].…”
Section: Introductionmentioning
confidence: 99%
“…However, all the features are converted, without any selection or post-processing to keep only the relevant ones. Different projects use such approach to obtain integrated datasets useful for visualisation-based analysis, e.g., Rafiee et al [24]. Observe here that for visualisation and other applications, such as daylight simulation, converting all the geometries is not a major hindrance since internal elements will not displayed or will not affect the end result.…”
Section: Previous Gis-bim Integration Effortsmentioning
confidence: 99%
“…Integration tasks provide new possibilities for both domains as BIM/IFC "contains very detailed and semantically rich information of a construction" (Rafiee et al, 2014) which is " […] usually not integrated with its surrounding information" (Rafiee et al, 2014) while "Geographic Information Systems (GIS), on the other hand, are capable of performing spatial analysis using the physical and functional spatial representations of an environment" (Rafiee et al, 2014) and thus, analysis might be more comprehensive "due to the complementary nature of the detailed construction information from the BIM and the information about the surrounding area" (Rafiee et al, 2014).…”
Section: Data Acquisition (R2)mentioning
confidence: 99%
“…El-Mekawy and Östman (2010) and El-Mekawy et al (2012) developed the UBM (Unified Building Model) for mapping between IFC and CityGML. Rafiee et al (2014) transformed an IFC model into a GIS environment to perform view and shadow analyses. Comparable studies show that it is not only possible to map and automatically transform between both domains, but also that there is much potential that could be revealed.…”
Section: Available Approaches/related Work (R5)mentioning
confidence: 99%