2015
DOI: 10.1016/j.fusengdes.2015.05.023
|View full text |Cite
|
Sign up to set email alerts
|

From the conceptual design to the first simulation of the new WEST plasma control system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…Some of the advanced control features required of the ITER PCS have been implemented to some extent on existing devices, including real-time actuator management [26,27] and exception handling [28][29][30]. The limited set of actuators, particularly the auxiliary heating systems, must perform multiple control functions throughout a plasma discharge sequentially or simultaneously as events occur in the plasma or plant systems.…”
Section: Actuator Management and Exception Handlingmentioning
confidence: 99%
“…Some of the advanced control features required of the ITER PCS have been implemented to some extent on existing devices, including real-time actuator management [26,27] and exception handling [28][29][30]. The limited set of actuators, particularly the auxiliary heating systems, must perform multiple control functions throughout a plasma discharge sequentially or simultaneously as events occur in the plasma or plant systems.…”
Section: Actuator Management and Exception Handlingmentioning
confidence: 99%
“…Recently, the control system framework of the ASDEX Upgrade (AUG) experiment, DCS [3], was adopted as a base control system of the WEST project [4] and moved from a dedicated implementation to a general-purpose platform. From its beginning DCS had been built on the above-mentioned principles for portable design.…”
Section: Introductionmentioning
confidence: 99%