All Days 2007
DOI: 10.2118/107903-ms
|View full text |Cite
|
Sign up to set email alerts
|

Implementation of a Shock and Vibration Mitigation Process: Achieving Real-Time Solutions and Savings

Abstract: Worldwide the costs associated with the exploration and production of oil have increased at a nearly exponential rate. This sharp rise in daily costs has also led to a new urgency from operators to find more reliable and efficient ways of doing business. Shock and vibration (S&V) are the leading cause of failure for measurements-while-drilling (MWD) and rotary steerable systems (RSS) today. These failures have a major impact on operators and service companies, costing millions of dollars … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
2

Year Published

2008
2008
2019
2019

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(6 citation statements)
references
References 4 publications
0
4
0
2
Order By: Relevance
“…Real-time optimization of drilling parameters by combining the monitoring vibration data was carried out. The stability map of high-frequency torsional vibration in the field was summarized [98,99] as shown in Figure 8, which provided a basis for controlling the drill string V&S. The low and high amplitude vibrations distinctly fall into zones, which indicate that high-frequency torsional vibration occurs at higher WOB and low RPM. The right "drilling dessert (optimum zone)" within a certain range can be found by optimization drilling parameters; optimization drilling parameters only solved the vibration sources frequency and nature frequency of drill string.…”
Section: Preventing Drill String Resonancementioning
confidence: 99%
“…Real-time optimization of drilling parameters by combining the monitoring vibration data was carried out. The stability map of high-frequency torsional vibration in the field was summarized [98,99] as shown in Figure 8, which provided a basis for controlling the drill string V&S. The low and high amplitude vibrations distinctly fall into zones, which indicate that high-frequency torsional vibration occurs at higher WOB and low RPM. The right "drilling dessert (optimum zone)" within a certain range can be found by optimization drilling parameters; optimization drilling parameters only solved the vibration sources frequency and nature frequency of drill string.…”
Section: Preventing Drill String Resonancementioning
confidence: 99%
“…Estas condiciones podrían causar problemas posteriores cuando se instala la tubería de revestimiento y se completa el pozo. [2] Estos parámetros aumentan su criticidad cuando la complejidad direccional se incrementa al igual que la longitud de la sección horizontal. (Figura # 3)…”
Section: Evolución De La Tecnología De La Perforación Direccionalunclassified
“…Para ello es necesario el uso de la comunicación en tiempo real mediante sondas de respuesta rápida -un sistema telemétrico de corta distancia que no requiere cableado-acerca de la posición actual del BHA y la posibilidad de evaluar la formación, todo esto mientras se está perforando, gracias al sistema de ("Measured While Drilling", MWD y LWD. [2,7] Dicha sonda de respuesta rápida conecta la interfaz del sistema telemétrico con el sistema MWD por medio de pulsos magnéticos y confirma que las instrucciones han sido recibidas en superficie.…”
Section: Conceptos Básicosunclassified
“…[6][7][8] Figure 1 shows bit damage caused by stick-slip vibration. 9,10 Previous work has investigated the suppression of stick-slip vibration in a drill string. Yigit and Christoforou 11 studied the effects of varying operating conditions on stick-slip and bit-bounce interactions and showed that the bit-rock contact conditions are a major influence on drill string dynamics.…”
Section: Introductionmentioning
confidence: 99%