2011
DOI: 10.1016/j.rcim.2011.02.005
|View full text |Cite
|
Sign up to set email alerts
|

Integrative development of product and production system for mechatronic products

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
26
0
1

Year Published

2012
2012
2022
2022

Publication Types

Select...
5
3
1

Relationship

1
8

Authors

Journals

citations
Cited by 51 publications
(27 citation statements)
references
References 4 publications
0
26
0
1
Order By: Relevance
“…Automatic marketplace (raw milk, packed eggs and bakery products) [5] Development was conducted according to the process shown in Fig. 2, which is a very simplified variant of the Gausemaier's 3-Cycle-Model [6]. The model in Fig.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Automatic marketplace (raw milk, packed eggs and bakery products) [5] Development was conducted according to the process shown in Fig. 2, which is a very simplified variant of the Gausemaier's 3-Cycle-Model [6]. The model in Fig.…”
Section: Resultsmentioning
confidence: 99%
“…2). It was later found that the development process in fact consists of a highly simplified Gausemaier's 3-Cycle-Model [6] with emphasized iterative developmental steps. …”
Section: Vending Machine Development Processmentioning
confidence: 99%
“…3) [1]. It matches and synchronizes the main phases of the conceptual design of the product and of the conceptual design of the production system.…”
Section: Integrative Conceptual Design Of Products and Productiomentioning
confidence: 96%
“…as all tools, machines or personnel that are required for the process. Each process step of the process sequence is allocated to at least one resource [6]. As well as the other relevant partial model, the resources will be characterised in more detail in the following chapter.…”
Section: The Specification Technique Consensmentioning
confidence: 99%