2015
DOI: 10.1016/j.proeng.2015.10.078
|View full text |Cite
|
Sign up to set email alerts
|

Investigation of Critical Activities in a Network with Point-to-point Relations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
5
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(6 citation statements)
references
References 3 publications
1
5
0
Order By: Relevance
“…This is also true for piecewise linearly segmented activities as shown in Figure 2g, which generate similar constellations, because their segments are bounded by slope changes. These findings do not contradict the conjecture, which had allowed "inner" points , i.e., mid-point relations, in referring to a previously published generalization (Bokor and Hajdu 2015;Hajdu 2015c). Third, a generalization of influence lines toward influence surfaces presents a detailed visualization of how three activities can dynamically interact.…”
Section: Contributions and Recommendationssupporting
confidence: 71%
“…This is also true for piecewise linearly segmented activities as shown in Figure 2g, which generate similar constellations, because their segments are bounded by slope changes. These findings do not contradict the conjecture, which had allowed "inner" points , i.e., mid-point relations, in referring to a previously published generalization (Bokor and Hajdu 2015;Hajdu 2015c). Third, a generalization of influence lines toward influence surfaces presents a detailed visualization of how three activities can dynamically interact.…”
Section: Contributions and Recommendationssupporting
confidence: 71%
“…Researchers [29] pointed out that the Critical Path Method (CPM) is the most frequently used method to plan and control the construction execution process. The CPM method facilitates the analysis of delays in (1) supporting the computation of project duration, shortest path, and critical path [30] and (2) analyzing the delayed activities' impact on the duration [31]. However, the CPM also has shortcomings.…”
Section: Delay Analysis Of Construction Managementmentioning
confidence: 99%
“…The results showed that the operating capabilities of city pairs between different airlines are spatially related, which were conducive to the reasonable development strategies for emerging low-cost airlines. Bokor et al [22] applied the city-to-city network to engineering practice projects, and the changes of specified projects have an impact on the whole. Never et al [23] found the potential driving factors and obstacles related to airline network connectivity, guided by innovation diffusion theory, and analyzed qualitative and quantitative data using the method of triangulation to provide references for airlines to make plans.…”
Section: Literature Reviewmentioning
confidence: 99%