2020
DOI: 10.24912/jmstkik.v4i1.6718
|View full text |Cite
|
Sign up to set email alerts
|

Kajian Penggunaan Cubicost Untuk Pekerjaan Quantity Take Off Pada Proses Tender

Abstract: The short duration of the tender process causes the time to do quantity take off for rebar is also short. This needs innovation to speed up the quantity take off for rebar in the tender process. The technological developments can be utilized to speed up quantity take off for rebar, one of that is Building Information Modeling (BIM). One of the BIM's that can be used to do quantity takeoff for rebar is "Take Off for Rebar" (TRB) produced by Cubicost company. The use of Cubicost TRB is currently still often foun… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
1
0
4

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 2 publications
0
1
0
4
Order By: Relevance
“…and Table 6. The percentage difference in the estimated volume of steel rebar between the conventional estimation method and the BIM-based estimation method is determined using the following equation processed from Anindya and Gondokusumo (2020). In Equation 1., the total volume 1 refers to the largest volume between the conventional estimation method and the BIM-based method, while the total volume 2 refers to the smaller one between the two estimation methods:…”
Section: Volume Aspect Of the Estimation Resultsmentioning
confidence: 99%
“…and Table 6. The percentage difference in the estimated volume of steel rebar between the conventional estimation method and the BIM-based estimation method is determined using the following equation processed from Anindya and Gondokusumo (2020). In Equation 1., the total volume 1 refers to the largest volume between the conventional estimation method and the BIM-based method, while the total volume 2 refers to the smaller one between the two estimation methods:…”
Section: Volume Aspect Of the Estimation Resultsmentioning
confidence: 99%
“…Kegiatan terdiri dari sosialisasi gambaran umum BIM khususnya BIM 5D, pentingnya penggunaan BIM 5D, manfaat, dan efisiensi penggunaan BIM 5D dengan salah satu jenis BIM 5D yakni Cubicost. Cubicost adalah salah satu dari beberapa jenis perangkat lunak yang menjadi bagian dari Building Information Modelling (BIM) berdimensi 5D yang memiliki keunggulan untuk melakukan pekerjaan quantity take off (Anindya & Gondokusumo, 2020). Kegiatan ini juga diikuti dengan pelatihan Cubicost BIM 5D untuk 3 tupoksi yang dimiliki Cubicost yaitu Takeoff for Architecture and Structure (TAS) untuk perhitungan elemen arsitektur dan struktur, Takeoff for Rebar (TRB) untuk perhitungan elemen pembesian, dan Tender Series for Bill of Quantity (TBQ) untuk perhitungan rancangan anggaran biaya pada proyek (PUPR, 2019).…”
Section: Pendahuluanunclassified
“…Salah satu BIM 5D yang dapat menentukan quantity take-off adalah BIM Cubicost (Anindya & Gondokusumo, 2020). BIM Cubicost mempunyai 4 seri yang dalam penggunaannya dapat membantu dalam menentukan perhitungan volume.…”
Section: Pendahuluanunclassified