“…(Niebel & Freivalds, 2014) To obtain and present the data, a time study with chronometer was performed and the operation diagram was used to identify the operations and the times in seconds that are required (Magu, Khanna & Seetharaman, 2015; Cuatrecasas-Arbos, Fortuny-Santos & Vintro-Sanchez, 2011). The dead times were identified with the man-machine diagram, with the analysis of this diagram a proposed method was developed with a new distribution of the manufacturing cell (Johnson 2003;Puvanasvaran, Mei & Alagendran, 2013;Ismail, Ghani, Ab Rahman, Deros & Haron, 2014), the standard time was calculated and finally, the partial productivity of the workforce was determined (León, Castillo & Molano, 2015).…”