2015
DOI: 10.24267/23462329.112
|View full text |Cite
|
Sign up to set email alerts
|

Medición del trabajo de una línea de producción de yogurt - empresa La Hacienda Productos Alimenticios

Abstract: El presente artículo expone los resultados de una investigación descriptiva tipo estudio de caso, realizada en la línea de producción de yogurt de una empresa de lácteos. Debido a que, la empresa no ha adelantado estudios similares, esta desconoce su capacidad real de producción, viéndose enfrentada a diversas situaciones como la incertidumbre del mercado que puede satisfacer, la cantidad de materia prima que debe adquirir, y desde luego, el número de trabajadores a contratar. En razón a ello, se decidió aplic… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…(Niebel & Freivalds, 2014) To obtain and present the data, a time study with chronometer was performed and the operation diagram was used to identify the operations and the times in seconds that are required (Magu, Khanna & Seetharaman, 2015; Cuatrecasas-Arbos, Fortuny-Santos & Vintro-Sanchez, 2011). The dead times were identified with the man-machine diagram, with the analysis of this diagram a proposed method was developed with a new distribution of the manufacturing cell (Johnson 2003;Puvanasvaran, Mei & Alagendran, 2013;Ismail, Ghani, Ab Rahman, Deros & Haron, 2014), the standard time was calculated and finally, the partial productivity of the workforce was determined (León, Castillo & Molano, 2015).…”
Section: Methodsmentioning
confidence: 99%
“…(Niebel & Freivalds, 2014) To obtain and present the data, a time study with chronometer was performed and the operation diagram was used to identify the operations and the times in seconds that are required (Magu, Khanna & Seetharaman, 2015; Cuatrecasas-Arbos, Fortuny-Santos & Vintro-Sanchez, 2011). The dead times were identified with the man-machine diagram, with the analysis of this diagram a proposed method was developed with a new distribution of the manufacturing cell (Johnson 2003;Puvanasvaran, Mei & Alagendran, 2013;Ismail, Ghani, Ab Rahman, Deros & Haron, 2014), the standard time was calculated and finally, the partial productivity of the workforce was determined (León, Castillo & Molano, 2015).…”
Section: Methodsmentioning
confidence: 99%