“…The same were identified as specific to the hotel refurbishments in the study, and as well recognised as the most common problems associated in all the three cases that were studied. However, lack of accurate and complete information (Ali, 2009;Ali and Rahmat, 2009;Ali, 2010;Ali, 2014;Babangida, 2014;Ekanayake et al, 2018), level of involvement of parties in design stage (CIRIA, 1994;Mitropoulos and Tatum, 2000;Arain, 2005;Ali and Rahmat, 2009), restricted access, temporary circulation and site boundary (CIRIA, 1994;Ikpe et al, 2006;Ali, 2009;Babangida, 2014), that were recognised as common issues in refurbishment projects, were not identified to be most common in hotel refurbishment projects in Sri Lanka. The reason is that due to the constraint on time availability, the most common problems were ought to be the problems that were common in all the three cases.…”