2013
DOI: 10.1109/tpwrs.2013.2265854
|View full text |Cite
|
Sign up to set email alerts
|

Multi-Area Energy and Reserve Dispatch Under Wind Uncertainty and Equipment Failures

Abstract: Abstract-The cross-border trading among electricity markets in an interconnected multi-area system (e.g., in central Europe) and the integration of renewable resources (e.g., wind energy) have remarkably increased in recent years. To efficiently operate such system, a proper coordination among different areas is required. Within this context, a decentralized algorithm for market clearing is proposed in this paper to dispatch simultaneously energy and reserve under wind generation uncertainty and equipment fail… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
53
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 118 publications
(53 citation statements)
references
References 29 publications
0
53
0
Order By: Relevance
“…SR is a commodity traded in the market to counteract unpredictable power changes [26]. The provision for SR, if possible and conveniently scheduled an accepted in the SR market, allows an enhancement on profitability for the power producer.…”
Section: Decision Frameworkmentioning
confidence: 99%
“…SR is a commodity traded in the market to counteract unpredictable power changes [26]. The provision for SR, if possible and conveniently scheduled an accepted in the SR market, allows an enhancement on profitability for the power producer.…”
Section: Decision Frameworkmentioning
confidence: 99%
“…Reference [14] presents a stochastic market-clearing model for a multi-area power system. The model described in [14] corresponds to an auction inspired by those used by most European electricity markets, which leave the on/off commitment decisions to the producers that own the production units.…”
Section: B Literature Review and Contributionsmentioning
confidence: 99%
“…We have found no reference in the domain of decentralized multi-area stochastic unit commitment. Hence, we propose to extend the market-clearing procedure presented in [14] by incorporating unit commitment 0/1 variables in the formulation. Note that including 0/1 variables make the model non-continuous and thus non-convex, and therefore much harder to solve.…”
Section: B Literature Review and Contributionsmentioning
confidence: 99%
See 1 more Smart Citation
“…On the other hand, the links between regional power grids are getting closer and closer through the ultrahigh voltage (UHV) DC transmission, and meanwhile the requirements for the communication capabilities of power grids are getting higher and higher accordingly. Thus, how to achieve the optimal dispatch of the whole power system under the precondition of reducing the computing scale of the interconnected system has become a research hotspot nowadays [5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%