2021
DOI: 10.1016/j.apenergy.2021.117459
|View full text |Cite
|
Sign up to set email alerts
|

Multi-objective optimization of a hydro-wind-photovoltaic power complementary plant with a vibration avoidance strategy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1
1

Relationship

2
8

Authors

Journals

citations
Cited by 48 publications
(10 citation statements)
references
References 40 publications
0
10
0
Order By: Relevance
“…It is evident that the crystal morphology and spatial conguration of NQ are critical in determining the mechanical integrity of the propellants. 24,25 3.3 Thermo mechanical response 3.3.1 Static thermo mechanical properties. Before commencing the thermal stability investigation, the thermogravimetric analyzer underwent calibration for both temperature and weight precision.…”
Section: Macroscopic Physicochemical Parametersmentioning
confidence: 99%
“…It is evident that the crystal morphology and spatial conguration of NQ are critical in determining the mechanical integrity of the propellants. 24,25 3.3 Thermo mechanical response 3.3.1 Static thermo mechanical properties. Before commencing the thermal stability investigation, the thermogravimetric analyzer underwent calibration for both temperature and weight precision.…”
Section: Macroscopic Physicochemical Parametersmentioning
confidence: 99%
“…Fig. 4 The Schematic diagram of the cone tube of the draft tube model (a) [35] and its equivalent circuit diagram (b). Fig.…”
Section: The Cone Tube Of the Draft Tube Model (A) (B)mentioning
confidence: 99%
“…To minimize the comprehensive operating cost of the system, the source-grid-load two-stage day-ahead-intra-day multi-time optimization scheduling method is constructed; the simulation verifies that the scheduling method can effectively promote the scenery consumption of a high percentage of the new energy grid and reduce the system operating cost. The literature [12] combined a hydrowind-photovoltaic complementary power plant and analyzes the scheduling strategy for integrated operation through multi-objective optimization to maximize power generation, minimize output power fluctuations, and minimize deviations between power generation and planned output. The literature [13][14][15] analyzed the fluctuation characteristics of wind power transmission, the operation characteristics of wind power grid connected transmission end, and UHVDC transmission, which provides a certain idea for wind power DC transmission.…”
Section: Introductionmentioning
confidence: 99%