2005
DOI: 10.1016/j.fusengdes.2005.06.315
|View full text |Cite
|
Sign up to set email alerts
|

Neutral beam injection optimization at TJ-II

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2006
2006
2024
2024

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…In the early phase of the ORNLICIEMA T collaboration, two ORNL neutral beam injectors (NBls) and ion sources were loaned to CIEMAT, through a contract with the U.S. Department of Energy. Thus, the NBI at TJ-II consists of two tangential injectors in the co-counter configuration [13]. At present, each NBI provides up to 450 kW of additional heating (tNBI ::; 100 ms) and, as a result, plasmas with ne(O) ::; 5 x 10 19 m-3 have been attained with a lithium coating on the vacuum vessel wall [12].…”
Section: Introductionmentioning
confidence: 99%
“…In the early phase of the ORNLICIEMA T collaboration, two ORNL neutral beam injectors (NBls) and ion sources were loaned to CIEMAT, through a contract with the U.S. Department of Energy. Thus, the NBI at TJ-II consists of two tangential injectors in the co-counter configuration [13]. At present, each NBI provides up to 450 kW of additional heating (tNBI ::; 100 ms) and, as a result, plasmas with ne(O) ::; 5 x 10 19 m-3 have been attained with a lithium coating on the vacuum vessel wall [12].…”
Section: Introductionmentioning
confidence: 99%
“…The project of the NBI system at 2 × 2 MW/100 s for EAST, started in 2008, will be completed in 2011. As one of the important sub-systems, its power supply [4,5] with a transmission line [6,7] (shown in Fig. 1) was designed in 2009 and will be built up in 2010.…”
Section: Introductionmentioning
confidence: 99%