New shipyard layout design for the preliminary phase & case study for the green field project

Abstract: For several decades, Asian nations such as

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0
2

Year Published

2019
2019
2022
2022

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 12 publications
(10 citation statements)
references
References 4 publications
0
8
0
2
Order By: Relevance
“…Sanderson and Cox [13] examined the dichotomy of deciding either lean or agile approach is less useful in a shipbuilding supply chain environment and stated the design and build process used in the shipyard introduces radical unpredictability into the demand for "functional" components of naval vessels. Song and Woo [14] used the green field project for an efficient and assembly oriented shipyard layout design and followed by Lee et al [15]. Lee [16] proposed directions to the small and medium sized shipyards such as; merger and acquisition, to switch activity from building to repair and maintenance, penetrating shipbreaking sector and establishing subcontractor links with the major shipyards for a [17] designed a lean oriented axiomatic occupational health and safety system and applied in a shipyard.…”
Section: Analyses Of the Resultsmentioning
confidence: 99%
“…Sanderson and Cox [13] examined the dichotomy of deciding either lean or agile approach is less useful in a shipbuilding supply chain environment and stated the design and build process used in the shipyard introduces radical unpredictability into the demand for "functional" components of naval vessels. Song and Woo [14] used the green field project for an efficient and assembly oriented shipyard layout design and followed by Lee et al [15]. Lee [16] proposed directions to the small and medium sized shipyards such as; merger and acquisition, to switch activity from building to repair and maintenance, penetrating shipbreaking sector and establishing subcontractor links with the major shipyards for a [17] designed a lean oriented axiomatic occupational health and safety system and applied in a shipyard.…”
Section: Analyses Of the Resultsmentioning
confidence: 99%
“…[36] Cleaner fuel & hybridization (Natural gas, H2, methanol etc.) [37] Changing the old equipment [38] Digital twin [39] Operation Resource management (Demand response management) [40] Lean approach [41][42][43] Production planning and strategy [44] Optimizing shipyard design [45] Policy and regulations Environmental regulations (international, regional, national, and local) [ PDCA Cycle within the Framework Shipbuilding is an energy-intensive industry 2 [58,66,67], and it is therefore important that energy savings are considered in the context of strategic management in order to continuously optimize energy consumption. However, in order to optimize energy consumption, the framework must be kept up to date and the PDCA (Plan-Do-Check-Act) function must be taken into account within the framework.…”
Section: Human Factorsmentioning
confidence: 99%
“…Galangan kapal merupakan bangunan atau tempat yang terletak ditepi pantai perairan laut atau ditepi sungai yang berfungsi sebagai tempat untuk membangun, mereparasi, dan pemeliharaan kapal. Berdasarkan aktivitasnya galangan dapat dibagi menjadi sebagai berikut: [3] 1. Galangan Kapal Baru (new building) 2.…”
Section: B Galangan Kapal/shipyardunclassified