2020
DOI: 10.1080/17445302.2020.1827633
|View full text |Cite
|
Sign up to set email alerts
|

Offshore oil and gas records circa 2020

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
7
1
1

Relationship

1
8

Authors

Journals

citations
Cited by 18 publications
(5 citation statements)
references
References 81 publications
0
5
0
Order By: Relevance
“…From this aspect, we conclude that AMSs have positive effects on the radiation responses compared with the original cone damping structures. On the other hand, by comparing with the added mass of the FCDS with a closed AMS, we see that the corresponding added mass for the heave and pitch are 1.8 × 10 8 kg and 8.0 × 10 10 kg.m 2 . It shows that the pervious AMS can significantly increase the added mass.…”
Section: Hydrodynamic Response In the Frequency Domainmentioning
confidence: 98%
See 1 more Smart Citation
“…From this aspect, we conclude that AMSs have positive effects on the radiation responses compared with the original cone damping structures. On the other hand, by comparing with the added mass of the FCDS with a closed AMS, we see that the corresponding added mass for the heave and pitch are 1.8 × 10 8 kg and 8.0 × 10 10 kg.m 2 . It shows that the pervious AMS can significantly increase the added mass.…”
Section: Hydrodynamic Response In the Frequency Domainmentioning
confidence: 98%
“…Offshore oil has reached about 30% of the whole production in 2019, and it will be undoubtedly increasing and will become the major contributor in the following years [1,2]. Floating production storage and offloading systems (FPSOs) are one of the most prevailing structures for deep-water oil field development due to their large storage capacity when compared with other floating platforms such as semisubmersibles, TLPs, and SPARs [3].…”
Section: Introductionmentioning
confidence: 99%
“…By rough estimates, an offshore platform that weight around 30,000 t could cost around 350-500 million dollars, plus another 60-120 million dollars for three tugboats. However, there are various studies that cover the accounting and costing of oil facilities and the financial aspect of project management [240][241][242][243][244][245][246][247][248][249][250][251].…”
Section: Pricing Offshore Projectsmentioning
confidence: 99%
“…Different factors also influence the type of asset management that will be considered as well as the metrics and indicators that will be used to evaluate the offshore facility [ 76 , 77 , 78 , 79 , 80 , 81 , 82 , 83 ]. These include the type of offshore platform [ 84 , 85 , 86 , 87 , 88 , 89 , 90 , 91 ], production operations [ 92 , 93 , 94 , 95 , 96 , 97 , 98 , 99 ], systems management model [ 100 , 101 , 102 , 103 ], fossil fuel deposits’ locations with historical exploration [ 104 , 105 , 106 , 107 , 108 , 109 , 110 , 111 , 112 , 113 , 114 , 115 , 116 , 117 ], etc. In the oil and gas industry, there are more challenges involving the application of offshore platforms in deep water locations [ 118 , 119 , 120 , 121 , 122 , 123 , 124 , 125 ].…”
Section: Introductionmentioning
confidence: 99%