On the reversed LCOE calculation: Design constraints for wave energy commercialization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
50
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 67 publications
(51 citation statements)
references
References 18 publications
0
50
0
1
Order By: Relevance
“…In addition, it is common for large civil beneficial project to be co-financed Public-Private Partnerships (PPP) reducing their level of danger, and can also be given preferential "social discount rates" from 1-5% [44]. The analysis estimates LCoE using the discounted method, and considering a lifetime for the OWC of 40 years, with a repowering of the electrical power take of the facility at year 20 (RePower 20 ), valued at 20% of the initial CapEx [45]. For breakwater integrated WECs, the majority of expenditure is civil engineering works.…”
Section: Methodsmentioning
confidence: 99%
“…In addition, it is common for large civil beneficial project to be co-financed Public-Private Partnerships (PPP) reducing their level of danger, and can also be given preferential "social discount rates" from 1-5% [44]. The analysis estimates LCoE using the discounted method, and considering a lifetime for the OWC of 40 years, with a repowering of the electrical power take of the facility at year 20 (RePower 20 ), valued at 20% of the initial CapEx [45]. For breakwater integrated WECs, the majority of expenditure is civil engineering works.…”
Section: Methodsmentioning
confidence: 99%
“…Other factors include costs related to construction and installation, maintenance cost, etc. [159][160][161]. In addition, some recent research studies [162,163] have studied the possibility of the collocation of wave energy converters and offshore wind turbines at the same geographical area to increase the energy output and reduce the variability of energy output, which also creates a number of important synergies and advantages including a reduction of installation costs combining foundations, electrical infrastructure, installation, planning and development, and a reduction of operational and maintenance costs.…”
Section: Cost Trends Of Wave Energy Convertersmentioning
confidence: 99%
“…In order to become commercial, the cost of energy will have to reduce. Of the different cost centres, which combine to result in a cost of energy, the Operational Expenditure (OPEX) represents a large proportion of the overall costs [7,8]. Installation and decommissioning costs also contribute significantly to LCOE and are surrounded by uncertainties due to the relatively few deployed projects.…”
Section: Introductionmentioning
confidence: 99%
“…Installation and decommissioning costs also contribute significantly to LCOE and are surrounded by uncertainties due to the relatively few deployed projects. In the literature, OPEX and installation costs of ocean energy developments have been found to represent around 1/3 of the total project costs [7,8] Variations in costs are attributed to different devices and sites. For some devices, operational costs are lower, as they can be assisted by smaller boats, or their sites allow wider operational weather windows.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation