2020
DOI: 10.1016/j.apenergy.2020.115368
|View full text |Cite
|
Sign up to set email alerts
|

Optimal scheduling method for belt conveyor system in coal mine considering silo virtual energy storage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
14
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 37 publications
(16 citation statements)
references
References 17 publications
0
14
0
2
Order By: Relevance
“…At present, the chain pitch of scraper conveyor is mainly measured manually. Mining workers use specially designed calipers to regularly sample and measure the scraper chain [7]. Figure 2 is a kind of measuring caliper for scraper chain deformation.…”
Section: Introductionmentioning
confidence: 99%
“…At present, the chain pitch of scraper conveyor is mainly measured manually. Mining workers use specially designed calipers to regularly sample and measure the scraper chain [7]. Figure 2 is a kind of measuring caliper for scraper chain deformation.…”
Section: Introductionmentioning
confidence: 99%
“…Conveyors are essential equipment in mining operations because they can efficiently and quickly transport materials from one location to another. Therefore, the use of conveyors in the mining industry is becoming more widespread and has become a commonly used tool (Mu et al, 2020). Conveyors have high transport efficiency and strong transport capacity (He et al, 2017).…”
Section: Introductionmentioning
confidence: 99%
“…Scheduling models have been developed for industries such as petrochemical industry, 16 mining, 18 metallurgy, 19 food processing, 20 agricultural irrigation, 21 and scientific testing services. 22 Water is often the target to be dispatched in industrial scheduling problems.…”
Section: Introductionmentioning
confidence: 99%
“…Compared with discrete-time models, continuous-time models are usually of smaller sizes and require less computational efforts for solution, but their structures tend to be more complicated, which makes formulating models tougher. 8 Scheduling models have been developed for industries such as petrochemical industry, 16 mining, 18 metallurgy, 19 food processing, 20 agricultural irrigation, 21 and scientific testing services. 22 Water is often the target to be dispatched in industrial scheduling problems.…”
Section: Introductionmentioning
confidence: 99%