2020
DOI: 10.1007/s42461-019-00138-z
|View full text |Cite
|
Sign up to set email alerts
|

Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 17 publications
0
7
0
Order By: Relevance
“…Anchor rods are used to support the surrounding rock and their stress characteristics and influence on the plastic zone are analyzed under these conditions using the NBSS model [ 39 ]. We adopted full-length bonded anchor rods with a diameter of 18 mm, length of 2.2 m, and spacing of 1.0 m as the support structure.…”
Section: Nbss Creep Damage Modelmentioning
confidence: 99%
“…Anchor rods are used to support the surrounding rock and their stress characteristics and influence on the plastic zone are analyzed under these conditions using the NBSS model [ 39 ]. We adopted full-length bonded anchor rods with a diameter of 18 mm, length of 2.2 m, and spacing of 1.0 m as the support structure.…”
Section: Nbss Creep Damage Modelmentioning
confidence: 99%
“…As a result, they found that the support schemes could effectively suppress the deformation of the surrounding rock mass by introducing support schemes at the goaf-side entry driving 7 . Besides, Ghosh et al conducted an analysis of chain pillars in multi-seam longwall mining panels in the coal mines in India 8 . However, these studies were conducted on coal mines with relatively high-strength geotechnical conditions.…”
Section: Introductionmentioning
confidence: 99%
“…Due to the disturbance of upper coal seam mining, the roof of the roadway is destroyed before the lower coal seam is mining, resulting in changes in the roof structure [1][2][3] and stress environment of the lower coal seam mining area [4,5]. In addition, the roadway surrounding rock is disturbed and destroyed repeatedly while mining the lower coal seam, which can easily lead to the instability and serious destruction of the roadway surrounding rock [6,7]. At present, the processes of mining and excavating have become unsmooth for most coal mines, the roadway support technology is unfeasible, there is a certain degree of convergence in the vertical and horizontal directions of the roadway [8], and significant roadway maintenance is required in the later stage of working face mining [9,10], which greatly affects the speed, safety, and efficiency of roadway excavation.…”
Section: Introductionmentioning
confidence: 99%