Peak Operation of Cascaded Hydropower Plants Serving Multiple Provinces

Abstract: Abstract:The bulk hydropower transmission via trans-provincial and trans-regional power networks in China provides great operational flexibility to dispatch power resources between multiple power grids. This is very beneficial to alleviate the tremendous peak load pressure of most provincial power grids. This study places the focus on peak operations of cascaded hydropower plants serving multiple provinces under a regional connected AC/DC network. The objective is to respond to peak loads of multiple provincia… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
8
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
9

Relationship

2
7

Authors

Journals

citations
Cited by 19 publications
(8 citation statements)
references
References 28 publications
0
8
0
Order By: Relevance
“…• The maximum ramping capacity for power generation Ph i h ,t − Ph i h ,t−1 ≤ Ph i h (13) where Ph i h denotes maximum ramping capacity of hydro plant i h in period t. The above constraint is considered to limit the extent of changes in generation between two adjacent periods.…”
Section: ) Hydropower Plant Constraintsmentioning
confidence: 99%
See 1 more Smart Citation
“…• The maximum ramping capacity for power generation Ph i h ,t − Ph i h ,t−1 ≤ Ph i h (13) where Ph i h denotes maximum ramping capacity of hydro plant i h in period t. The above constraint is considered to limit the extent of changes in generation between two adjacent periods.…”
Section: ) Hydropower Plant Constraintsmentioning
confidence: 99%
“…Their models relate only to the maximum and minimum of residual load series during optimization. Shen et al [13] and Feng et al [14] formulated the peak-shaving model by minimizing the mean square deviation of the residual load series. The model requires the daily energy target of each power plant.…”
Section: Introductionmentioning
confidence: 99%
“…Because of a locally underdeveloped economy, the major part of electricity from these plants is transmitted to load centers in eastern and coastal China via ultrahigh voltage direct current (UHVDC) lines. In particular, some large hydropower projects need to simultaneously undertake the electric supply for multiple regions or provinces [5,6]. For example, the famous Three Gorges Project is connected to three big regional power grids to serve their subordinate provinces.…”
Section: Introductionmentioning
confidence: 99%
“…References [22] and [23] formulated a linear programming (LP) and a nonlinear programming (NLP) optimization model, respectively, for the power allocation among multiple power grids. Reference [24] proposed a two-stage search method to determine the shortterm generation scheduling of the cascaded hydropower plants transmitting electric power to multiple power grids through trans-provincial HVAC tie-lines. Reference [25] focused on determining the generation scheduling of a hydrothermal system which are required to satisfy the peakshaving demands of multiple provincial power grids.…”
Section: Introductionmentioning
confidence: 99%