Performance Analysis of Hybrid Power Plant (Wind and Solar) in Baron Techno Park Gunung Kidul Yogyakarta

Abstract: Renewable energy is generated through the conversion process of energy sources whic h are abundant in the earth such as wind, sun, heat, rain, geothermal, hydro, ocean

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 0 publications
0
2
0
1
Order By: Relevance
“…According to NASA (National Aeronautics and Space Administration) data, the average wind speed in this case is 4.42 m/s at an altitude of 50 m. In August, the highest wind speed is 6.15 m/s, while the lowest wind speed is 2.91 m/s. NASA provided monthly solar radiation data in December for this study The highest solar radiation was obtained in September, namely 6.56 kWh / m 2 / day with a clarity index of 0.646, while the lowest solar radiation was 5.08 kWh / m 2 / day in January with a clarity index of 0.469 (Pae et al, 2017).…”
Section: Resultsmentioning
confidence: 99%
“…According to NASA (National Aeronautics and Space Administration) data, the average wind speed in this case is 4.42 m/s at an altitude of 50 m. In August, the highest wind speed is 6.15 m/s, while the lowest wind speed is 2.91 m/s. NASA provided monthly solar radiation data in December for this study The highest solar radiation was obtained in September, namely 6.56 kWh / m 2 / day with a clarity index of 0.646, while the lowest solar radiation was 5.08 kWh / m 2 / day in January with a clarity index of 0.469 (Pae et al, 2017).…”
Section: Resultsmentioning
confidence: 99%
“…Salah satu yang dikembangkan adalah sistem pembangkit listrik tenaga bayu atau angin. Sistem pembangkit energi angin tersebut telah disinkronkan dengan energi surya menjadi sumber energi hybrid [2] untuk memasok kebutuhan energi listrik di KST tersebut [3].…”
Section: Pendahuluanunclassified
“…From the analysis of identification of both solar systems and operating thermal power station and the installed electrical load PLTH is able to meet Baron Techno Park. In addition, the system connected to the electricity grid (on-grid) have a higher economic improvement compared to system off-grid [6].…”
Section: Introductionmentioning
confidence: 99%