Perhitungan Economic Dispatch Tiga Buah Pembangkit Menggunakan Metode Merit Order Dengan Mempertimbangkan Losses

Abstract: Merit order adalah metode paling sederhana dalam economic dispatch yang dilakukan dengan mengurutkan pembangkit dari yang paling rendah sampai yang paling tinggi biaya operasinya. Pembangkit yang paling rendah biaya operasinya (Rp/MWh) dianggap sebagai pembangkit yang paling ekonomis. Penelitian ini membahas tentang perhitungan daya pada pembangkit dengan menggunakan metode merit order. Ada tiga pembangkit yang digunakan untu menyuplai beban sebesar 975 MW. Simulasi digunakan dengan memperhitungkan losses. Has… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…DMN represents the net capability of power plants according to the power purchase agreement between the generating companies and PLN and may be revised with a declaration letter from the Regional Operations Division of PLN [4]. Merit order is the simplest method in economic dispatch, ordering power plants from the lowest to the highest operating costs [5]. IFC (Incremental Fuel Cost) is defined as the change in fuel cost resulting from changes in generated power output [6].…”
Section: Methodsmentioning
confidence: 99%
“…DMN represents the net capability of power plants according to the power purchase agreement between the generating companies and PLN and may be revised with a declaration letter from the Regional Operations Division of PLN [4]. Merit order is the simplest method in economic dispatch, ordering power plants from the lowest to the highest operating costs [5]. IFC (Incremental Fuel Cost) is defined as the change in fuel cost resulting from changes in generated power output [6].…”
Section: Methodsmentioning
confidence: 99%
“…There are several methods to determine the power plant produced power that already used widely, and the most popular one is merit order method. This method was already used in the previous article [9] to determine the power of three power plants. This method offers a very simply algorithm as it only make an order of the existing power plant based on the heat rate and function cost of the particular power plants.…”
Section: Introductionmentioning