Planejamento da Transmissão via Meta-Heurística Híbrida

Abstract: This work presents a hybrid method based on the Gray Wolf Optimizer (GWO) and Whale Optimization Algorithm (WOA) metaheuristics where a discrete variable treatment is proposed to solve the transmission line expansion planning problem. Active transmission power losses and the deterministic N-1 reliability criterion are included in the problem. The Garver and Southern Brazilian equivalent systems are used to show the efficiency of the proposed methodology. Resumo: Este trabalho apresenta um método hibrido basead… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 13 publications
0
3
0
Order By: Relevance
“…This test system was proposed by [44] to perform reliability analysis that, after modifications in generation and load data, was also used for STNEP studies [5], [45], [46], [9], [12], among others. Because it is known by the international community, it is a good option for testing new optimization techniques.…”
Section: V1 Ieee Test System (Ieee-24/41)mentioning
confidence: 99%
See 2 more Smart Citations
“…This test system was proposed by [44] to perform reliability analysis that, after modifications in generation and load data, was also used for STNEP studies [5], [45], [46], [9], [12], among others. Because it is known by the international community, it is a good option for testing new optimization techniques.…”
Section: V1 Ieee Test System (Ieee-24/41)mentioning
confidence: 99%
“…According to [5], [12], [49] and several other authors, the optimal solution for this system, without considering the effect of active power losses but allowing generation redispatch (G0 generation scenario in [47], is composed of five circuits connected in four branches (#6-10=1, #7-8=2, #10-12=1, #14-16=1) and costs US$ 152 million.…”
Section: V11 Lossless Optimal Solutionsmentioning