2021
DOI: 10.1016/j.psep.2021.02.040
|View full text |Cite
|
Sign up to set email alerts
|

Predicting major hazard accidents in the process industry based on organizational factors: A practical, qualitative approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(4 citation statements)
references
References 25 publications
0
4
0
Order By: Relevance
“…Performance evaluation of barriers presented in the bow tie diagram (Figure 6) was executed to periodically define their respective condition/status for each monitored water storage dam. Similar to Schmitz et al 29 three options for barrier qualification are considered here: “trustworthy (T),” “not trustworthy (NT),” and “possibly not trustworthy (PNT).” A barrier is considered trustworthy when it is maintained, inspected, and/or tested as scheduled, and not trustworthy when it is inactivated or defective. In the area in between there may be reasons to assume that the barrier is possibly not trustworthy due to lagging or lacking maintenance, inspection and/or testing, or otherwise.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Performance evaluation of barriers presented in the bow tie diagram (Figure 6) was executed to periodically define their respective condition/status for each monitored water storage dam. Similar to Schmitz et al 29 three options for barrier qualification are considered here: “trustworthy (T),” “not trustworthy (NT),” and “possibly not trustworthy (PNT).” A barrier is considered trustworthy when it is maintained, inspected, and/or tested as scheduled, and not trustworthy when it is inactivated or defective. In the area in between there may be reasons to assume that the barrier is possibly not trustworthy due to lagging or lacking maintenance, inspection and/or testing, or otherwise.…”
Section: Resultsmentioning
confidence: 99%
“…Barriers performance evaluationPerformance evaluation of barriers presented in the bow tie diagram (Figure6) was executed to periodically define their respective condition/status for each monitored water storage dam. Similar to Schmitz et al29 three options for barrier qualification are considered here:…”
mentioning
confidence: 99%
“…Performing a safety risk assessment before construction is of particular significance for construction safety management. In fact, traditional safety risk management systems are designed by monitoring and investigating safety hazards that have already occurred to develop targeted countermeasures to reduce the risk of future repeat safety events [7,8]. Summarizing the causes of past accidents and the injury data of each influencing factor helps to identify safety risk signals and alerts before the start of similar projects to ensure the safe progression of the project [9].…”
Section: Introductionmentioning
confidence: 99%
“…a problem which, despite frequent consideration, still requires attention and which will be given a lot of attention for a long time (Golubović et. al., 2021;Schmitz, et al, 2021;Swuste, et al, 2016). As the history of industrial incidents shows, the process industry is the most critical in terms of equipment failures and the consequences that accompany those failures.…”
Section: Introductionmentioning
confidence: 99%