2011 IEEE Power and Energy Society General Meeting 2011
DOI: 10.1109/pes.2011.6039696
|View full text |Cite
|
Sign up to set email alerts
|

Reliability constrained unit commitment with electric vehicle to grid using Hybrid Particle Swarm Optimization and Ant Colony Optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0
1

Year Published

2013
2013
2022
2022

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 29 publications
(23 citation statements)
references
References 14 publications
0
19
0
1
Order By: Relevance
“…Additionally, power system operations are also Table 2 Summary of optimization for V2G control strategy. [17,18,28,31,51,68,[82][83][84][85][86][87][88]90,91] (b) Load leveling (b) Maximize renewable energy generation limited by numerous constraints in the process of achieving multiple objectives [82]. For the V2G system, the dynamic and random behaviors of EV mobility will further increase the power system complexity.…”
Section: Optimization Of V2g Algorithmmentioning
confidence: 99%
See 1 more Smart Citation
“…Additionally, power system operations are also Table 2 Summary of optimization for V2G control strategy. [17,18,28,31,51,68,[82][83][84][85][86][87][88]90,91] (b) Load leveling (b) Maximize renewable energy generation limited by numerous constraints in the process of achieving multiple objectives [82]. For the V2G system, the dynamic and random behaviors of EV mobility will further increase the power system complexity.…”
Section: Optimization Of V2g Algorithmmentioning
confidence: 99%
“…The power grid operation cost includes fuel cost, start-up cost and V2G cost [86,90]. Fuel cost, FC is expressed as a second order function of the unit generated power as shown below [17]:…”
Section: Operation Costmentioning
confidence: 99%
“…These heuristics presented an initial solution worse than the ACO in [86], however shown a much lower execution time than the ACO algorithm. Beyond the mentioned use of ACO to provide the initial solution to SA proposed in [86], a hybrid PSO and ACO algorithm is proposed in [112] to deal with short-term unit commitment problem with EVs considering different reliability limits.…”
Section: Heuristic and Meta-heuristic Algorithmsmentioning
confidence: 99%
“…Particle swarm optimization (PSO) has been used to address EDP with wind power and EV battery swap stations [78]. PSO has also been applied in reliability constrained unit commitment from EV to grid [79]. The combination of modern heuristic optimisation algorithms and Monte Carlo experiments have proved to be an efficient solution in address the optimisation problem.…”
Section: Solution For Edp Considering Phevs/evsmentioning
confidence: 99%