Risk Management Measures in CMMI

Abstract: Risk management is a continuous process that could endanger the objectives of a project or application. Risks are handled to reduce and avoid threats effects on the objectives of the project. The sources of risk are both internal and external to the project. This research will identify general measures for the specific goal and its specific practices of Risk Management Process Area (PA) in Capability Maturity Model Integration (CMMI). CMMI is developed by Software Engineering Institute (SEI) in Carnegie Mellon… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
6
0
1

Year Published

2013
2013
2022
2022

Publication Types

Select...
5

Relationship

3
2

Authors

Journals

citations
Cited by 6 publications
(7 citation statements)
references
References 21 publications
0
6
0
1
Order By: Relevance
“…Various researches aimed to measure the software process that has been suggested, such as [21,[31][32][33][34][35][36][37][38][39][40][41]. The works that are related the most to our work are represented in the works of [21,31,32,[35][36][37][38][39][40][41]. Baumertand McWhinney [42] point out to several observations that are usefulfor measuring the practices (general characteristics) that are defined in the Capability Maturity Model for CMM/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Various researches aimed to measure the software process that has been suggested, such as [21,[31][32][33][34][35][36][37][38][39][40][41]. The works that are related the most to our work are represented in the works of [21,31,32,[35][36][37][38][39][40][41]. Baumertand McWhinney [42] point out to several observations that are usefulfor measuring the practices (general characteristics) that are defined in the Capability Maturity Model for CMM/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
“…Loconsole [13] (CMM/SW), rather than (CMMI/SW). Khraiwesh, [31,[35][36][37][38][39]41] identifies a set of measures for processessuch as validation, process and product quality assurance, risk management, project planning, project monitoring and control, and configuration management in CMMI/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
“…There are also many specialized tools and systems designed for, or at least more commonly used in, specific industries. These systems include Capability Maturity Model Integration (CMMI) (Khraiwesh, ; Grossi, Calvo‐Manzano, and San Feliu, ), Information Technology Infrastructure Library (ITIL) (Kabachinski, ; Soomro, ), and Control Objectives for Information and Related Technology (COBIT) (Baldassarre et al, ).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The SEPMP shares with many of these systems, tools, and standards the basic concepts in problem management (Olson et al, ). These include problem identification using established thresholds and decision criteria, root cause analysis, problem assessment, developing resolution strategies and deciding which to implement, and instituting corrective and preventative actions (Baldassarre et al, ; Khraiwesh, ; Olson et al, ; Soomro, ). Common tools are also referenced, such as Failure Modes and Effects Analysis (FMEA), trend analysis, data mining, and more (Olson et al, ; Bhatia and Awasthi, ; Grossi et al, ).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Loconsole's work was based on CMM/SW not CMMI/SW. Khraiwesh[28] provided software measurements for Risk Management PA of the CMMI/SW. This paper defines a set of general measures that are focused on a specific PA, which is Project Planning PA of the CMMI/SW.…”
mentioning
confidence: 99%