Scheduling families of jobs with setup times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
21
0

Year Published

1999
1999
2014
2014

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 60 publications
(21 citation statements)
references
References 17 publications
0
21
0
Order By: Relevance
“…Additional setup cost to switch between workstations, jobs, or products. Galvin (1987), Gascon and Leachman (1988), Sethi and Sethi (1990), Yan and Zhang (1997), Wolsey (1997), Van Oyen (1998), Inman (1999), Tsubone and Horikawa (1999), Robinson and Sahin (2001), Lahmar et al (2003), Han et al (2003), Hur et al (2003), de Matta and Miller (2004), Hajji et al (2004), Wu et al (2004), Brahimi et al (2006) Switching the production rate Hall (1988), Kim and Han (2001), Kamrad and Ernst (2001), Larsen (2005) Machine start-up/shutdown Pattloch and Schmidt (1996), Liaee and Emmons (1997), Kim and Han (2001), Khouja (2005), Sim et al (2006) Machine cleaning Kumar (1995), Wolsey (1997), Olson and Schniederjans (2000), Robinson andSahin (2001), de Matta andMiller (2004), Brahimi et al (2006) Production loss Watkins (1957), Paul et al (1980), Weber (2006 Tooling Kumar (1995), Sim et al (2006), Brahimi et al (2006) Deterioration in quality Paul et al (1980), Khouja (2005) Machine adjustment Koulamas (1993), …”
Section: Accounting For Switching (Changeover) Costsmentioning
confidence: 99%
“…Additional setup cost to switch between workstations, jobs, or products. Galvin (1987), Gascon and Leachman (1988), Sethi and Sethi (1990), Yan and Zhang (1997), Wolsey (1997), Van Oyen (1998), Inman (1999), Tsubone and Horikawa (1999), Robinson and Sahin (2001), Lahmar et al (2003), Han et al (2003), Hur et al (2003), de Matta and Miller (2004), Hajji et al (2004), Wu et al (2004), Brahimi et al (2006) Switching the production rate Hall (1988), Kim and Han (2001), Kamrad and Ernst (2001), Larsen (2005) Machine start-up/shutdown Pattloch and Schmidt (1996), Liaee and Emmons (1997), Kim and Han (2001), Khouja (2005), Sim et al (2006) Machine cleaning Kumar (1995), Wolsey (1997), Olson and Schniederjans (2000), Robinson andSahin (2001), de Matta andMiller (2004), Brahimi et al (2006) Production loss Watkins (1957), Paul et al (1980), Weber (2006 Tooling Kumar (1995), Sim et al (2006), Brahimi et al (2006) Deterioration in quality Paul et al (1980), Khouja (2005) Machine adjustment Koulamas (1993), …”
Section: Accounting For Switching (Changeover) Costsmentioning
confidence: 99%
“…Earlier results in this area have been reviewed in (Ham, Hitomy and Yoshida, 1985;Potts and Van Wassenhove, 1991). More recent results can be found in (Kovalyov and Tuzikov, 1994;Janiak and Kovalyov, 1995;Liaee and Emmons, 1997;Liu and Yu, 1999;Janiak, Shafransky and Tuzikov, 2001).…”
Section: Introductionmentioning
confidence: 97%
“…Ahn and Hyun (1990), Bruno and Sethi (1977), Mason and Anderson (1991), and Monma and Potts (1989) propose algorithms for minimizing total weighted flowtime on a single machine with family setup times. We refer to Webster and Baker (1995) and Liaee and Emmons (1997) for a review of scheduling literature on family scheduling problems. Further we note here that sequence-dependent setup times tend to make solutions difficult to find.…”
Section: Introductionmentioning
confidence: 99%