2019 International Seminar on Intelligent Technology and Its Applications (ISITIA) 2019
DOI: 10.1109/isitia.2019.8937246
|View full text |Cite
|
Sign up to set email alerts
|

Security Constrained Unit Commitment Considering Ramp Rate and Transmission Line Losses Using Binary Particle Swarm Optimization Based on IEEE 30 Bus System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…1 includes three thermal power units, two CHP units, a pumped storage power station, a heat storage tank and a wind turbine. The unit datas are from references [8] and [9] . The electricity load and wind power are based on the real operating data of the California Electric Power System CASIO [10] , and the heat load is derived from the Open Power System Data [11] 2017-2018 German users' heat demand.…”
Section: Example Analysismentioning
confidence: 99%
“…1 includes three thermal power units, two CHP units, a pumped storage power station, a heat storage tank and a wind turbine. The unit datas are from references [8] and [9] . The electricity load and wind power are based on the real operating data of the California Electric Power System CASIO [10] , and the heat load is derived from the Open Power System Data [11] 2017-2018 German users' heat demand.…”
Section: Example Analysismentioning
confidence: 99%