Spare Parts Estimation for Machine Availability Improvement Addressing Its Reliability and Operating Environment — Case Study

Abstract: Industrial operation cost analysis shows that, in general, maintenance represents a significant proportion of the overall operating costs. Therefore, the improvement of maintenance follows the final goal of any company, namely, to maximize profit. This paper studies spare parts availability, an issue of the maintenance process, which is an important way to improve production through increased availability of functional machinery and subsequent minimization of the total production cost. Spare parts estimation b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 11 publications
0
7
0
Order By: Relevance
“…Therefore, a method was developed to forecast and estimate accurately the spare parts requirements considering the operating environment and to create rational part ordering strategies. Subsequent studies of the same topic (see Ghodrati and Kumar (2005), Ghodrati (2006), and Ghodrati et al (2013)) showed that there is a significant difference in spare parts estimation when considering or ignoring the influence of the operating environment. Similarly, Barabadi (2012) presented a proportional hazard model and its extension in order to analyze the effect of the operational environment for spare parts provision.…”
Section: Accepted Manuscriptmentioning
confidence: 99%
“…Therefore, a method was developed to forecast and estimate accurately the spare parts requirements considering the operating environment and to create rational part ordering strategies. Subsequent studies of the same topic (see Ghodrati and Kumar (2005), Ghodrati (2006), and Ghodrati et al (2013)) showed that there is a significant difference in spare parts estimation when considering or ignoring the influence of the operating environment. Similarly, Barabadi (2012) presented a proportional hazard model and its extension in order to analyze the effect of the operational environment for spare parts provision.…”
Section: Accepted Manuscriptmentioning
confidence: 99%
“…This problem was addressed by emphasising the time between failures [7] using the queuing theory or Markov chains [8,9]. However, as pointed out by Ghodrati and Kumar [10], the queuing theory-based models have theoretical drawbacks, such as constant failure and repair rates, which prevent them from representing real-world systems.…”
Section: Literature Overviewmentioning
confidence: 99%
“…Several techniques based on statistical methods [13], artificial intelligence [14], Monte Carlo simulation [15], and non-linear programming [16] have been used to forecast spare part demands. Since reliability characteristics are a function of operation time and environmental operating factors [10,17], the estimates made by the above reliability-based models lack the confidence of maintenance engineers. Environmental operating conditions are important for asset reliability, reflecting the demand for spare parts.…”
Section: Literature Overviewmentioning
confidence: 99%
See 1 more Smart Citation
“…A review of literature supports these findings. Extensive research has been conducted in this area to include studies on machine availability (Ghodrati et al 2013), preventative maintenance (Jiang et al 2015), and level of repair Chang et al (2005) across industry segments such as Original Equipment Manufacturers (Behfard et al 2015), third-party providers (Kazemi Zanjani and Nourelfath 2014), and electronics repair (Schroter and Spengler 2004). Despite research demonstrating the impact of service parts availability on overall cost (Louit et al 2011) and customer service (Dekker et al 1998), the data from the current research suggests a gap between extant research and managerial application in that most research examines only direct relationships between service parts management and one performance goal.…”
Section: Parts Availabilitymentioning