2016
DOI: 10.20998/2074-272x.2016.5.07
|View full text |Cite
|
Sign up to set email alerts
|

Statistical Procedures for Two-Sided Limit of a Controlled Parameter in the Process of Production of Cable and Wire Products

Abstract: Purpose. To consider issues of statistical control in the process of mass production of cable and wire products on the example of enameled wire. To analyze the results of direct control of the diameter of the wire in two-layer polyimide insulation in a continuous technological cycle. To submit to the control map of maximum probability of the exit diameter outside a specific range. To analyze the conditions under which maximum sensitivity of process control. Methodology. Study of the sensitivity of the control … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
7
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(7 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…The concept of «Six Sigma Methodology» is a demonstration of the achievements of leading manufacturers and does not include a methodology for achieving achievements (why not «7σ»?). And the more the technological cycle is automated, the problem of organizing the use of the modern system of technological online defectiveness monitoring is more urgent, since between the tasks of receiving and current technological monitoring there is a significant theoretical and technical difference [4]. The problem of organizing active online technological monitoring is conceptualized for automated mass production.…”
Section: представлены результаты определения напряжения пробоя изоляцmentioning
confidence: 99%
“…The concept of «Six Sigma Methodology» is a demonstration of the achievements of leading manufacturers and does not include a methodology for achieving achievements (why not «7σ»?). And the more the technological cycle is automated, the problem of organizing the use of the modern system of technological online defectiveness monitoring is more urgent, since between the tasks of receiving and current technological monitoring there is a significant theoretical and technical difference [4]. The problem of organizing active online technological monitoring is conceptualized for automated mass production.…”
Section: представлены результаты определения напряжения пробоя изоляцmentioning
confidence: 99%
“…And the more the technological cycle is automated, the more this problem becomes actual. At the same time, its solution requires the adoption of non-standard technical and technological solutions, since there is a significant theoretical and technical difference between the tasks of acceptance and current technological control [4]. The problem of the organization of active technological control is conceptual for a modern, mass productionoriented, development and automation company.…”
mentioning
confidence: 99%
“…Therefore, the statistical procedure for processing the results of technological control requires the development of an algorithm for processing and presenting the results; Algorithm of decision making. The above general concept of technological control [4] is relevant. Its specific implementation in automated and high-speed continuous technological cycles of modern cable production requires, in addition to almost instantaneous efficiency (on-line mode) [2,3,5] solutions to a number of problems: scientific and technical.…”
mentioning
confidence: 99%
See 2 more Smart Citations