“…the site characteristics needed to support both the high-resolution and the coronal science objectives. Conceptual, preliminary, and final design phases and reviews were conducted between 2003 and 2009 Rimmele et al, 2003aRimmele et al, ,b, 2005Keil et al, , 2004Oschmann et al, 2004;Wagner et al, 2006;Rimmele, Keil, and Wagner, 2008;Keil, Rimmele, and Wagner, 2010). Design and development of first-light instrumentation progressed simultaneously (Rimmele et al, 2004;Elmore et al, 2014).…”