The multimode resource constrained multiproject scheduling problem: Alternative formulations

Abstract: in Wiley InterScience (www.interscience.wiley.com).Tactical management of development pipelines is concerned with the allocation of resources and scheduling of tasks. Though these decisions have to be made in the presence of uncertainty, to make the problem solvable it is customary to use deterministic MILP formulations of the multi-mode RCMPSP that are reevaluated after important uncertainties are realized. In spite of the major simplifications attained by down-playing the stochastic nature of the problem, th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
25
0

Year Published

2011
2011
2016
2016

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 44 publications
(25 citation statements)
references
References 19 publications
0
25
0
Order By: Relevance
“…The results of the comparative study in Naber and Kolisch (2014) indicate that an MIP formulation based on Bianco and Caramia (2013) dominates all other DT formulations. In the study of Zapata et al (2008), alternative DT and CT formulations for the MRCPSP with multiple projects are compared. The authors conclude that the best MIP formulation depends on the specific characteristics of each problem instance.…”
Section: Comparative Studies Of Mip Formulationsmentioning
confidence: 99%
“…The results of the comparative study in Naber and Kolisch (2014) indicate that an MIP formulation based on Bianco and Caramia (2013) dominates all other DT formulations. In the study of Zapata et al (2008), alternative DT and CT formulations for the MRCPSP with multiple projects are compared. The authors conclude that the best MIP formulation depends on the specific characteristics of each problem instance.…”
Section: Comparative Studies Of Mip Formulationsmentioning
confidence: 99%
“…The standard MRCPSP requires sequencing the project activities, so that the precedence constraints are met, the execution mode for each activity is determined, the resource constraints are met and the project duration is minimized. In spite of having several mathematical models for MRCPSP [2] and [13], the model from Talbot [14] is still being used as a basis for discrete time approach and hence is employed throughout this paper as the discrete time (DT) approach for comparing with our proposed models. In the MRCPSP model, a binary decision variable is defined to be 1 if activity starts at mode m at time instant , and 0 otherwise.…”
Section: The Mathematical Modelsmentioning
confidence: 99%
“…A variant of RCPSP is known as the Multi-mode Resource Constrained Project Scheduling Problem (MRCPSP) and for it each activity can be performed using one out of a set of different resources (known as modes), with specific activity durations and resource requirements. MRCPSP provides the most comprehensive framework for realistically representing the flexibilities that decision makers have [2]. MRCPSPs have many applications within computer integrated manufacturing, planning in make-to-order production, as well as other production planning problems, such as flow shop and job shop scheduling problem.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations