Observatory Operations: Strategies, Processes, and Systems VII 2018
DOI: 10.1117/12.2313606
|View full text |Cite
|
Sign up to set email alerts
|

The science calibration challenges of next generation highly multiplexed optical spectroscopy: the case of the Maunakea Spectroscopic Explorer

Abstract: MSE is an 11.25m telescope with a 1.5 sq.deg. field of view. It can simultaneously obtain 3249 spectra at R = 3000 from 360−1800nm, and 1083 spectra at R = 40000 in the optical. The large field of view, large number of targets, as well as the use of more than 4000 optical fibres to transport the light from the focal plane to the spectrographs, means that precise and accurate science calibration is difficult but essential to obtaining the science goals. As a large aperture telescope focusing on the faint Univer… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
5

Relationship

4
1

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 17 publications
0
4
0
Order By: Relevance
“…With respect to our work plan which was presented at the last SPIE conference in 2016, we have made substantial progress: The international design team has completed the enclosure and telescope structure conceptual designs, selected a multiplexing configuration, developed the LMR and HR [16,17] spectrograph designs, and established a fibre testing facility [18] to characterize the fibre transmission system performance. In conjunction, the PO has established the science calibration methodology [19] , system budgets [20] , and observatory operations concept [21,22] . Together, the CoDP work culminated in a successful System level conceptual design review in January 2018.…”
Section: Discussionmentioning
confidence: 99%
“…With respect to our work plan which was presented at the last SPIE conference in 2016, we have made substantial progress: The international design team has completed the enclosure and telescope structure conceptual designs, selected a multiplexing configuration, developed the LMR and HR [16,17] spectrograph designs, and established a fibre testing facility [18] to characterize the fibre transmission system performance. In conjunction, the PO has established the science calibration methodology [19] , system budgets [20] , and observatory operations concept [21,22] . Together, the CoDP work culminated in a successful System level conceptual design review in January 2018.…”
Section: Discussionmentioning
confidence: 99%
“…20), the spectral calibration (Ref. 21,22), the throughput optimization (Ref. 23,24), the observing efficiency (Ref.…”
Section: Introductionmentioning
confidence: 99%
“…20), the spectral calibration (Ref. 21,22), the throughput optimization (Ref. 23,24), the observing efficiency (Ref.…”
Section: Introductionmentioning
confidence: 99%