Thermal Segregation of Asphalt Material in Road Repair

Abstract: h i g h l i g h t s Thermal segregation is developed in patching in both winter and summer seasons. Long haulage time of HMA progresses thermal segregation. Poor insulation measures of HMA during transportation raises thermal segregation.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
3
1

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 2 publications
0
3
0
Order By: Relevance
“…Asphalt mixture temperatures, wind velocity and environmental conditions at the time of the repair will affect this rapid decrease in temperature. Furthermore, fast cooling can be mainly observed in the edges of the repair due to cold underlying asphalt layer resulting in low dense interfaces and weak points prone to premature failure (Dong et al 2014, Byzyka et al 2017b.…”
Section: Introductionmentioning
confidence: 99%
“…Asphalt mixture temperatures, wind velocity and environmental conditions at the time of the repair will affect this rapid decrease in temperature. Furthermore, fast cooling can be mainly observed in the edges of the repair due to cold underlying asphalt layer resulting in low dense interfaces and weak points prone to premature failure (Dong et al 2014, Byzyka et al 2017b.…”
Section: Introductionmentioning
confidence: 99%
“…Recent research, which includes observations on pothole repair production and detailed monitoring of them, indicates that many repairs commence failing within a short time after completion (Byzyka et al, 2016). This failure is usually caused by five main parameters named as improper transportation method, thermal segregation, inadequate compaction, insufficient bonding between the host and the new hot mix asphalt, and improper pothole geometry preparation.…”
Section: Introductionmentioning
confidence: 99%
“…Due to the defect of design standard, the durability of concrete is insufficient. The cost of maintenance is increasing continuously which causes huge economic loss [2,3]. Therefore, studying the effect of dynamic flexural loading and dry-wet cycles on chloride ions diffusion in concrete is of great significance for ensuring the safe operation of concrete works in the chloride enrichment area, and accurately predicting and improving the service life of the project.…”
Section: Introductionmentioning
confidence: 99%