2008
DOI: 10.3846/1392-3730.2008.14.29
|View full text |Cite
|
Sign up to set email alerts
|

Visualizing Simulated Monolithic Construction Processes/Sumodeliuoto Monolitinių Statybų Proceso Vizualizavimas

Abstract: Abstract. This paper concerns visualizing simulated construction processes by using two modules, which are part of the expert system. Modelling and analyzing construction processes by using simulation and visualizing results technique allows participants to provide an in-depth insight into this complex undertaking. The system discussed has a hierarchical and modular structure and is designed for monolithic constructions. Major elements of this system are objects such as: concrete mixers, buckets, slip forms, c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 32 publications
0
2
0
Order By: Relevance
“…However, most of knowledge management is good at collecting and storing knowledge in the text-based environment. Communication and discussion may be enhanced effectively by visualization among all participants (Hajdasz 2008). The use of the 3D object models have essentially contributed to a shared understanding of intentions, needs and geometrical relations among actors representing different backgrounds, interests and positions (Moum 2010).…”
Section: Methodology -Bim-based Knowledge Managementmentioning
confidence: 99%
“…However, most of knowledge management is good at collecting and storing knowledge in the text-based environment. Communication and discussion may be enhanced effectively by visualization among all participants (Hajdasz 2008). The use of the 3D object models have essentially contributed to a shared understanding of intentions, needs and geometrical relations among actors representing different backgrounds, interests and positions (Moum 2010).…”
Section: Methodology -Bim-based Knowledge Managementmentioning
confidence: 99%
“…It can realize real-time construction visualization. Besides, communication and discussion among all participants may be enhanced effectively by visualization (Hajdasz 2008). The use of the 3D object models have essentially contributed to a shared understanding of intentions, needs and geometrical relations among actors representing different backgrounds, interests and positions (Moum 2010).…”
Section: Research Methods -Bim-based Interface Managementmentioning
confidence: 99%
“…It is also used as an efficient instrument to visualize progress and manage construction works (Lin 2014). The AEC's communication and discussion can be improved through visualization during the construction phase (Hajdasz 2008). Nevertheless, AEC can create additional management units, such as experience and knowledge management, which could be accommodated within the BIM platform.…”
Section: Possible Uses Of Bim In the Construction Phasementioning
confidence: 99%