This report is one of a series prepared annually to provide an evaluation of the status of groundwater contamination resulting from Hanford onsite discharges. This issue covers the data collected January through December 1975. The maps of the contamination plumes and the data tables are provided to allow comparison with previous report periods. The previous report in this series was BNWL-1970. (l) An additional parameter included in this report is the distribution of groundwater temperatures beneath the site.
Background: Ground heat exchangers installed in boreholes are an expensive component of a ground-coupled heat pump system, where minimizing the borehole length with appropriate materials and configuration can reduce the overall cost of the system. Methods: Design calculations performed analytically indicate that the coaxial pipe configuration can be more advantageous than the single U-pipe configuration to reduce the total borehole length of a system. Results: A decrease of the borehole thermal resistance and an increase of the thermal mass of water contained in the coaxial exchanger helped to reduce borehole length by up to 23% for a synthetic building load profile dominated by cooling. The decrease of the borehole thermal resistance was achieved with an outer pipe made of thermally enhanced high-density polyethylene, where the thermal conductivity is 0.7 W m -1 K -1 .
Canada has enormous geothermal energy resources that could supply a renewable and clean source of power. There are many constraints, however, in utilizing this energy resource, including geological, technical, and regulatory issues. The intent of this report is
to examine the geothermal potential in Canada, and the geological controls on the distribution of high grade resources as well as controls on the economic development and production of geothermal energy. This assessment is based on a new compilation and digitization of data produced through over 48
years of geothermal research in Canada. Recommendations on current and future research needs to reduce barriers to resource production are made at the end of the report. Currently Canada has no geothermal electrical production; however, direct use and heat exchange systems are used widely. Several
projects are currently being examined by industry and government to develop electrical potential in Canada. A key economic constraint for these projects is the high risk of exploration due to costs of deep drilling. The cost of delivered geothermal power is projected to decline and be competitive
with coal fired production within the next 15 years, given current levels of technology. Canada's in-place geothermal power exceeds one million times Canada's current electrical consumption (Fig. 1). However, only a fraction of this total potential could be developed. Much of the resource lies
beyond current drilling technology, outside of areas served by high-capacity transmission lines, and at some distance from load centres. Nonetheless, the available high grade geothermal resource is considerable. High temperature hydrothermal systems can be brought on line with proven technology.
Many of the tools required to bring geothermal energy to full realization, however, are not commercially proven to date and require further research and technology development. We can expect a strong learning curve and price response as geothermal energy is developed while other energy sources such
as coal and nuclear will begin to see fleet and capacity retirements.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.